4.3 The incoming inspection plan
Quality cannot be inspected into a product at the receiving dock; instead, the role of IQC is to thoughtfully verify that the supply chain has delivered the required quality. This plan defines the structured logic for safely accepting incoming materials into the warehouse.
Risk-based inspection logic
Section titled “Risk-based inspection logic”Inspecting 100% of every incoming reel of resistors is an inefficient use of quality resources. Instead, a risk-based approach is recommended to allocate IQC bandwidth where failure is most likely—and financially most costly.
Class A: high risk (critical / custom)
Section titled “Class A: high risk (critical / custom)”- Items: Bare PCBs, Custom Mechanicals (like Plastics and Metals), Complex Cables, Displays, Batteries, and safety-critical parts.
- Logic: These physical components naturally exhibit higher manufacturing variability, or they carry a severe impact on product safety and function if they fail.
- Guideline: An AQL 0.65 or 1.0 (Level II) plan should be utilized. Mandatory dimensional and detailed visual checks should be performed.
Class B: medium risk (active components)
Section titled “Class B: medium risk (active components)”- Items: Integrated Circuits (ICs), High-Pin-Count Connectors, LEDs, Transistors, and expensive active modules.
- Logic: While intrinsic silicon manufacturing defects from the component maker are rare, mishandling, packaging errors, MSL violations, or hidden ESD damage are far more common in the supply chain.
- Guideline: An AQL 1.0 (Level I) plan should be utilized. Focus must be placed heavily on verifying supplier labels, packaging integrity, and the physical condition of the fragile leads.
Class C: low risk (standard passives)
Section titled “Class C: low risk (standard passives)”- Items: Standard Resistors, Capacitors, Screws, and Washers (Common commercial off-the-shelf catalog parts).
- Logic: The production processes for these passive components are highly automated worldwide and statistically very stable.
- Guideline: These should be placed on Dock-to-Stock (DTS) status. The dock team only needs to verify the
Manufacturer Part Number and Quantity. Physical inspection is usually suspended unless flagged by subsequent process failures on the floor.
The golden rules of verification
Section titled “The golden rules of verification”Before ever opening a sealed reel or a boxed shipment, the inspector should perform the “Label vs. System” triangular check. The vast majority of IQC escapes are actually administrative mismatches, not physical component defects.
- MPN Match: Does the
Manufacturer Part Number on the physical label match the ERP system exactly? (For example, an ATMEGA328P-AU behaves differently than an ATMEGA328P-MU, and the letters matter). - AVL Verification: Is this specific manufacturer actively listed on the
Approved Vendor List (AVL) for this particular project build? - Date Code Review: Is the component within the allowable age limit (typically < 2 years from date of manufacture)?
- If the Date Code is > 2 years, it is best practice to temporarily block the material and request a fresh Solderability Test to ensure the leads haven’t oxidized.
Component-specific inspection criteria
Section titled “Component-specific inspection criteria”These focused checks should be applied based on the specific component family being evaluated.
A. bare PCBs (the foundation)
Section titled “A. bare PCBs (the foundation)”The bare PCB is an incredibly complex component. If it is flawed, the entire PCBA built on top of it becomes expensive scrap.
- Warpage: The
bare board must be placed on a verified, flat surface plate. Any natural bow and twist must be ≤ 0.75% of the diagonal dimension (unless IPC-6012Class 3 dictates a tighter tolerance for the build). - Solder Mask: A careful visual check for any signs of peeling or blistering mask must be performed.
- Pads/Finish: It must be verified that ENIG or HASL finishes are clean and not oxidized. Any notable discoloration or dullness is usually grounds for rejection or further evaluation.
- Dimensional: The critical housing cutouts and mounting holes must always be measured against the engineering drawing.
B. moisture sensitive devices (MSDs)
Section titled “B. moisture sensitive devices (MSDs)”ICs and modules packaged in moisture barrier bags (MBB) are highly sensitive components if mismanaged during transit.
- Humidity Indicator Card (HIC): The outer cardboard box must be opened. The HIC must be checked through the bag (if the bag is transparent) or immediately upon carefully opening the seal.
- If the 10% spot is pink, the internal environment is wet. The lot must be rejected or a proper, controlled bake cycle mandated immediately to recover them.
- Bag Integrity: A close inspection for punctures or loss of vacuum must be performed. If the aluminum bag does not tightly conform to the reels inside, the internal dry environment has been compromised.
C. custom mechanics (enclosures / metal)
Section titled “C. custom mechanics (enclosures / metal)”- Fit Check: A quick physical mating test with a validated Golden Sample counterpart must always be performed.
- Cosmetics: The surfaces must be inspected under standard, bright lighting (800-1000 lux) at roughly arm’s length (approx. 40-50cm).
- Scratches: Generally, none are allowable on Class A (user-facing) aesthetic surfaces.
- Flash/Burrs: These must not interfere with assembly fit, nor should they present any scratch or injury risk to the operator.
- Color: The plastic color must be compared directly against the signed “Limit Sample” or the officially specified Pantone swatch.
D. connectors & electro-mechanical
Section titled “D. connectors & electro-mechanical”- Pin Condition: The connector must be inspected closely for bent pins or poor coplanarity. If surface-mount pins are not entirely flat and parallel, they will almost certainly cause open solder joints during the
reflow soldering process. - Plating: A check for obvious signs of tarnish, oxidation, or exposed base metal on the critical friction contact surfaces must be performed.
Sampling strategy (AQL)
Section titled “Sampling strategy (AQL)”Utilizing the ANSI/ASQ Z1.4 (ISO 2859-1) standard is recommended to maintain disciplined sampling.
- Normal Inspection: This level should be started at for all new vendors and new part numbers.
- Reduced Inspection: This level can be safely switched to if a vendor successfully passes 10 consecutive lots without issue.
- Tightened Inspection: Escalation to this level is necessary if 2 out of 5 consecutive lots are rejected.
Example Scenario:
Upon receiving 500 units of a Custom Plastic Case (Class A):
- Reference the Table: A lot size of 281-500 maps to Sample Size Code H.
- Determine Sample Size: Exactly 50 units must be carefully inspected.
- Apply AQL 1.0 Criteria:
- Accept: If 1 defect is found.
- Reject: If 2 defects are found.
- Action: If 2 non-conforming units are found, it is generally best to reject the entire shipment. Sorting parts in-house is strongly advised against unless explicitly authorized by management, and the sorting cost is formally charged back to the supplier.
Non-conformance management (MRB)
Section titled “Non-conformance management (MRB)”When a lot fails
Standard Dispositions:
- “RTV” (Return to Vendor): This is the standard, expected procedure for non-conforming material.
- UAI (
Use As Is ): This disposition requires formal Engineering and Quality Approval. It is typically only used if the defect is purely cosmetic and has zero impact on form, fit, or function (e.g., an incorrect font used on an internal, hidden label). - Sort/Rework: In this scenario, the EMS performs sorting or rework at the supplier’s expense. This requires a written commercial agreement on hourly billing rates established before the extra work begins.
Pro-Tip: Caution must be exercised when considering accepting a “marginal” lot to keep the production line running. Doing so effectively assumes ownership of the risk. If the yield subsequently drops at the SMT process due to those parts, the customer will likely not absorb the cost of the scrap. A formal concession from the appropriate engineering authority must always be secured before releasing marginal parts to the floor.
Final Checkout: The incoming inspection plan (IQC)
Section titled “Final Checkout: The incoming inspection plan (IQC)”| Parameter | Guideline / Standard | Action Owner |
|---|---|---|
| Inspection Standard | ANSI/ASQ Z1.4, Level II (Default base). | IQC Lead |
| Critical Metric: PCB | Bow/Twist must be verified to be ≤ 0.75%; solderability must be confirmed. | IQC Inspector |
| Critical Metric: MSL | HIC Card check should be mandated for all bagged ICs. | IQC Inspector |
| Documentation | A CoA (Certificate of Analysis) is required for chemicals. | Supplier |
| Rejection Trigger | AQL Threshold Reached -> Stop -> Notify Purchasing. | Quality Engineer |
| Date Code Limit | Generally max 2 years from seal date (unless extended). | ERP System / IQC |
| ESD Control | It must be ensured the IQC Station is grounded and wrist straps worn. | Safety Officer |