3 . New product introduction & industrialization
Transitioning a product from a design lab to a high-volume SMT line is the most high-risk phase in manufacturing. If the industrialization process is loose, design flaws will scale exponentially.
This chapter defines the role of Customer Success during
- 3.1 NPI stage gates: commercial & technical
New Product Introduction (NPI) is the highest-risk phase in the manufacturing lifecycle. It is where margins are engineered or destroyed. A failed NPI phase results in "unstable equilibrium"—a product...
- 3.2 PVT / pilot run readiness: tooling, test & yield
PVT (Production Validation Test) is not a "practice run"; it is a stress test of the manufacturing system. The objective is to prove that the **process**—not just the product—is capable of volume prod...
- 3.3 SOP readiness & transfer to volume
Start of Production (SOP) is the specific moment where the project transitions from an Engineering Cost Center to an Operational Profit Center. It is not a date on a calendar; it is a certified state...