Skip to main content
Advanced Search
Search Terms
Content Type

Exact Matches
Tag Searches
Date Options
Updated after
Updated before
Created after
Created before

Search Results

396 total results found

3.4 Control Plan + Reaction Plan (Stop/Contain/Release Rules)

08. Quality Assurance & Regulatory Comp... Part 3. Advanced Planning (NPI) & Compl...

The Control Plan (CP) is the operational constitution of the manufacturing floor. While the PFMEA predicts theoretical risk, the Control Plan prescribes the actual policing of that risk. It is the single source of truth that translates engineering intent (GD&T...

6.2 Calibration Management

08. Quality Assurance & Regulatory Comp... Part 6. Measurement & Validation

Measurement without calibration is just an opinion. In a high-precision manufacturing environment, an uncalibrated gauge is a liar that provides false confidence. Calibration Management is not merely about applying stickers to tools; it is the rigorous mainten...

2.1 ESD Control Program (ANSI/ESD S20.20)

08. Quality Assurance & Regulatory Comp... Part 2. Preservation of Product (Handli...

Electrostatic Discharge (ESD) is the invisible assassin of modern electronics. Unlike a short circuit or a broken trace, ESD damage often manifests as a latent defect — the "walking wounded." A component may pass final test today but fail in the field after 20...

2.2 MSD Handling & Storage (J-STD-033)

08. Quality Assurance & Regulatory Comp... Part 2. Preservation of Product (Handli...

Moisture Sensitivity Devices (MSD) fail not due to corrosion, but due to internal vapor pressure. During the rapid thermal ramp of reflow soldering (ambient to 240˚C+ in minutes), trapped moisture at the die-to-plastic interface vaporizes. This expansion gener...

3.2 Material Compliance: RoHS, REACH, & Conflict Minerals

08. Quality Assurance & Regulatory Comp... Part 3. Advanced Planning (NPI) & Compl...

Material compliance is not a "green initiative"; it is a binary gate for market entry. A single non-compliant capacitor (costing $0.01) containing > 1,000 ppm of Lead (Pb) can legally trigger a recall of millions of dollars of finished product in the EU or Cal...

8.5 RMA Processing & Field Failure Analysis

08. Quality Assurance & Regulatory Comp... Part 8. The Audit Architecture

Field returns (RMA) are the only source of truth in manufacturing. Internal yield metrics only measure your ability to build the product; RMA data measures the product's ability to survive reality. A robust Field Failure Analysis (FFA) is not a "returns depart...

9.4 The Quarterly Business Review (QBR) & Quality Strategy

08. Quality Assurance & Regulatory Comp... Part 9. Continuous Improvement

Management Review is frequently misunderstood as a bureaucratic "death by PowerPoint" ritual. In a high-performance EMS environment, this is the single most critical strategic alignment event of the year. It is the mechanism where Top Management is legally and...

1.4 Competence & Training Management (Skills Matrix)

08. Quality Assurance & Regulatory Comp... Part 1. The Quality Management System (...

In electronics manufacturing, "Training" is an event; "Competence" is a demonstrable outcome. An operator who "attended the class" but cannot distinguish a cold solder joint is a liability, not an asset. Unqualified personnel are the single largest source of v...

6.3 Equipment Validation (IQ/OQ/PQ)

08. Quality Assurance & Regulatory Comp... Part 6. Measurement & Validation

Verification (inspecting the product) tells you if you made a mistake; Validation (qualifying the process) ensures you cannot make a mistake. In high-reliability EMS, you cannot inspect quality into a product—especially when the critical characteristics are hi...

7.3 Test Process Quality (ICT/FCT & Retest Limits)

08. Quality Assurance & Regulatory Comp... Part 7. Process Control & Metrics (Moni...

Testing is not a value-added process; it is an interrogation. A test station does not fix quality; it merely segregates the survivors from the casualties. In high-volume manufacturing, the most dangerous behavior is "Testing Into Compliance"—the act of re-test...

8.2 Internal MRB & Quarantine Discipline

08. Quality Assurance & Regulatory Comp... Part 8. The Audit Architecture

The Material Review Board (MRB) process is not a "repair shop" or a storage room for mistakes; it is a crime scene investigation. Every item in the MRB cage represents a failure of the process controls upstream. As a Quality Director, your mandate is simple: S...

1.3 Change Control & Configuration Management (ECR/ECO/Deviation control)

08. Quality Assurance & Regulatory Comp... Part 1. The Quality Management System (...

Quality engineering is not just about inspecting what was made; it is about verifying what should be made. Without robust Change Control, the "Golden Sample" becomes a myth, and production quality slowly degrades due to entropy. A Quality Engineer’s primary fu...

1.5 Templates Pack: NCR, CAPA, Audit, Calibration, Incoming Report

08. Quality Assurance & Regulatory Comp... Part 1. The Quality Management System (...

A template is not a form; it is a data collection instrument. If you allow free-text chaos in your records, you cannot calculate a Pareto chart, you cannot trend supplier performance, and you cannot predict failures. This section defines the Minimum Viable Fi...

2.3 Shelf Life & Expiry Control: Chemical Integrity

08. Quality Assurance & Regulatory Comp... Part 2. Preservation of Product (Handli...

Electronics manufacturing relies on chemistry as much as physics. Solder paste, Anisotropic Conductive Film (ACF), conformal coatings, and potting compounds are reactive polymers. From the moment of manufacture, these materials degrade. "Shelf Life" defines th...

3.6 Regulatory Compliance: The EMS Interface

08. Quality Assurance & Regulatory Comp... Part 3. Advanced Planning (NPI) & Compl...

As an Electronic Manufacturing Services (EMS) provider, we do not own the design, nor do we sign the Declaration of Conformity. However, we are the physical gatekeepers of compliance. If we build a product that deviates from the customer’s Technical Constructi...

5.7 Defect Taxonomy & Disposition Rules (Linked to MRB)

08. Quality Assurance & Regulatory Comp... Part 5. Workmanship Standards (The "Bui...

Ambiguity in defect classification paralyzes production lines. If an operator cannot instantly distinguish between a "process indicator" and a "functional failure," they will either scrap good parts (wasting money) or pass bad parts (risking liability). This c...

6.4 Inspection Method Validation (AOI/X-Ray/ICT/FCT Correlation)

08. Quality Assurance & Regulatory Comp... Part 6. Measurement & Validation

Inspection is not a passive filter; it is a data acquisition system that defines the physical reality of the PCBA. Relying on unvalidated machines is arguably worse than no inspection at all, as it creates a false sense of security while satisfying neither phy...

8.1 NCR Workflow: Detect, Quarantine, Disposition, Close

08. Quality Assurance & Regulatory Comp... Part 8. The Audit Architecture

A Non-Conformance Report (NCR) is not a bureaucratic punishment; it is the immune system of the factory. It flags foreign risks—defective parts, process drifts, or documentation errors—and isolates them before they infect the final product. A sloppy NCR proces...

8.4 Containment Playbook: Suspect Lots, Line Stop Triggers & Escape Handling

08. Quality Assurance & Regulatory Comp... Part 8. The Audit Architecture

When a defect is detected, the immediate priority is not Root Cause Analysis; it is Containment. You cannot investigate a fire while the building is still burning. This chapter defines the emergency protocols to "stop the bleeding"—isolating the risk, defining...

9.3 Audit Program: Annual Plan, Checklist Library & Evidence Index

08. Quality Assurance & Regulatory Comp... Part 9. Continuous Improvement

An audit program is not a calendar of meetings to satisfy an ISO registrar; it is the primary sensor network for organizational health. If your audits consistently report "No Findings" while your customer complaints are rising, your audit program is broken. Th...