3.3 Through-Hole (THT) and Manual Assembly
Where automation ends, skilled craftsmanship begins; the "Back End" of the PCB assembly process handles heavy-duty components that require mechanical strength surpassing what surface mount soldering can provide. Connectors, large capacitors, and power transformers typically require Through-Hole Technology (THT), utilizing metal leads that pass through the board to create a reinforced mechanical bond.
Wave Soldering: The Bulk Process
For boards with high counts of THT components, Wave Soldering offers the highest throughput.
- Fluxing: A spray fluxer coats the bottom of the board to clean oxides.
- Preheat: Infrared heaters raise the board temperature to prevent thermal shock (100°C - 130°C) and activate the flux.
- The Wave: The board passes over a standing wave of molten solder. The solder pumps up into the holes via capillary action, filling the barrel and filleting around the lead.
- Pallets: To protect SMT parts already on the bottom side, the board is often locked into a "selective pallet" made of composite material, which masks off everything except the THT pins.
Selective Soldering: The Precision Robot
For dense boards where wave pallets are not feasible, Selective Soldering is employed.
- Mini-Wave: A robotic nozzle creates a small fountain of solder (3mm - 10mm diameter).
- Programmable: The robot moves the board or the nozzle to solder individual points sequentially. This provides the quality of a wave solder joint without the thermal stress or masking requirements of the bulk wave process.
Manual Soldering and Inspection
Human operators perform tasks too complex or accessible for machines.
- IPC Certification: Technicians must be certified to IPC-J-STD-001 standards.
- Fillet Inspection: Quality is verified visually. IPC Class 2 requires 50% vertical fill of the hole; IPC Class 3 (Medical/Aero) requires 75% fill.
- AOI Integration: Post-wave Automated Optical Inspection (AOI) checks for solder bridges, missing pins, and insufficient wetting, acting as a gate before final assembly.
Final Checklist
Parameter | Function | Critical Limit / Standard |
Barrel Fill | Mechanical Strength | >75% (Class 3) / >50% (Class 2) |
Preheat Temp | Shock Prevention | 90°C - 120°C (Topside) |
Dwell Time | Solder Contact | 2 - 4 seconds per joint |
Flux Application | Oxide Removal | Uniform coverage, no skips |