Skip to main content

1.1 Mission & Vision: Defining "From Atom to Cloud"

InThe high-reliabilitymission manufacturing,of processthis integrityorganization is non-negotiable.to bridge the physical reality of precision hardware manufacturing with the speed and scale of digital infrastructure. The handbookcore ispurpose not a suggestion; it isof the Controlling Document that formalizes all engineering, quality, and operational standards within the facility. Its functionsystem is to eliminate ambiguity,the enforcefriction standardizedinherent practices,in developing, producing, and servesupporting ascomplex electronic products globally.

The Mission Statement: Why Dannie Exists

The organization exists to ensure that the single,assembly of reliable hardware is governed by auditable sourcedigital standards.

Dannie exists to build the world's most reliable and traceable physical products by digitally unifying the entire manufacturing lifecycle—from the raw material (Atom) to the final deployment and service infrastructure (Cloud).

Atom to Cloud Defined

This phrase defines the mandatory scope of truthcontrol and data integrity:

  1. Atom (Material Origin): Traceability begins at the raw material level, requiring lot number control for every process.critical Adherencecomponent (PCBs, microprocessors, wire spools). This ensures quality defects can be traced back to thisthe documentoriginal supplier source.
  2. Cloud (Digital Service): Data integrity extends through the product's lifespan, linking the factory's production record (MES) to field performance, firmware updates, and customer service data.

The Vision: Perfect Process Synchronization

The long-term vision is mandatoryto achieve a state of Perfect Process Synchronization, where the physical reality of every board, every harness, and every enclosure flawlessly matches the digital blueprint. This eliminates process friction, accelerates design cycles, and ensures complete, auditable quality for allcritical personnel.applications.

0.1.1

Synchronization Goal

Synchronization means that the data systems (MES, ERP, PLM) always reflect the actual state of the physical world. This includes:

  • BOM Integrity: The Mandate:electronic Single SourceBill of TruthMaterials (BOM) matches the physical components installed.
  • Recipe Alignment: The authorized Reflow Profile (digital recipe) matches the measured board temperature (physical profile).
  • Fault Reporting: Failures reported in the field immediately link back to the exact manufacturing step and component lot used.

Operational Definition: Non-Negotiable Outputs

The handbookorganization's existsmission totranslates eliminateinto variationthree non-negotiable operational outputs that govern every engineering decision.

1. Zero Guesswork

Every engineering and preventassembly thedecision creationmust ofbe "shadow processes"—informal or undocumented methods developedbased on theaccessible, factoryverified floor.

The Definitive Authority

The handbook establishes procedural authority across all functional disciplines.data.

  • Process Control:Mandate: It containsProhibit the final,use verifiedof subjective judgment or "tribal knowledge." All critical parameters (torque settings, crimp heights, component placements) must be defined, measured, and stored in a central database (MES).
  • DFM Integration: The design phase must integrate manufacturing risk data (FMEA) to ensure design decisions are validated against actual process capability.

2. Total Traceability

Every product StandardSerial WorkNumber Instructions(SN) (SWI)must forbe linked to its complete genealogical history. This is a foundational audit mandate.

  • Genealogy Scope: Traceability must include the lot numbers of all critical operationsraw materials, the unique torque values applied to safety fasteners, final test results, and rework attempt counts (torqueChapter sequencing, soldering profiles, cleaning)6.3).
  • Technical Specification:Auditability: ItThe actssystem asmust theprovide finalan referenceunalterable, forcomprehensive acceptablerecord tolerancesthat can satisfy rigorous external regulatory and customer audits (e.g., IPC Class limits, acceptable solder void percentages) and measurement systems.
  • Prohibition: No process, procedure, or quality standard may be implemented or used on the factory floor unless it is formally documented and resident within the current revision of this handbook.

Eliminating Ambiguity

When a procedural or technical dispute arises, the handbook provides the immediate and final resolution.

  • The Final Arbiter: The document serves as the absolute arbiter during conflict resolution between departments (e.g., Quality vs. Manufacturing).
  • Communication: It standardizes the technical language and process nomenclature used within the organization, minimizing errors caused by miscommunication.

0.1.2 Deviation and Process Fault

Any failure to follow the defined procedure is categorized as a Process Fault or Non-Conformance that must be logged and addressed.

Managing Deviations

  • Mandate: Any deviation from the established procedure (e.g., using a non-standard component, omitting a quality check) is prohibited unless formally authorized by a temporary Manufacturing Engineering Deviation (MED) or a permanent Engineering Change Notice (ECN).
  • Auditable Record: All deviations must be logged into the MES (Manufacturing Execution System) and linked to the unit's Serial Number (SN)3).

The3. CAPAMaximum TriggerReliability

The existence of an undocumented process or a repeated violation of the handbook procedure is a mandatory trigger for a Corrective and Preventive Action (CAPA) investigation (Chapter 6.9). The Root Cause Analysis (RCA) must identify why the documented procedure was not followed, leading to a system fix, not just a procedural reiteration.

0.1.3 Auditing and Document Control

The integritycore ofprocesses themust handbookbe isstatistically maintainedcontrolled throughto disciplinedexceed revisionindustry-standard controlquality and continuous audit.goals.

Revision Control

  • ControlledStatistical Document:Control: The handbookprocess ismust abe statistically controlled documentusing subjectSPC (Statistical Process Control) to strictachieve revisionreliability management.levels Onlythat theminimize current revision is authorized for use.defects.
  • Update Process:Target: All changesmission-critical processes must followaim theto formalstatistically exceed ECR6s $\to$ ECN $\to$ Implementationigma flowgoals, corresponding to ≈ 3.4 Defects Per Million Opportunities (Chapter 6.11).
  • Mandate: Personnel must verify the revision of the procedure they are using before beginning any work.

The Basis for Audit

The handbook is the mandatory checklist for all quality verification activities.

  • Internal Audits (LPA): The handbook's procedures form the basis for all Layered Process Audit (LPA)DPMO questions conducted internally (Chapter 6.4)).
  • External Audits: External auditors (e.g., ISO, Customer) verify compliance by checking that the actual factory process matches the procedures documented in the handbook.

Final Checklist

Mandate

Criteria

Verification Action

DocumentOrganizational AuthorityFocus

TheMission handbookcentered serveson asunifying theAtom final,(Material) absoluteand Cloud (Digital Service).

Ensures business strategy aligns with technical reality and data scope.

Synchronization

Vision requires ControllingPerfect DocumentProcess Synchronization. between physical and digital states.

All proceduralprocess disputessettings (Recipes, BOMs) are resolvedvalidated byagainst referencingphysical theoutput current handbook revision.measurements.

AdherenceTraceability Standard

AdherenceEvery toproduct themust documentedachieve processtotal, isauditable mandatorygenealogical for all personnel.traceability.

DeviationMES fromaudit procedureconfirms isall loggedprocess asvariables aare Processlinked Fault into the MES.

Revisionunit Control

AllSN changes(Serial follow the formal ECR $\to$ ECN authorization flow.

The MES system blocks use of procedures based on obsolete revisions.Number).

Quality System LinkGoal

TheCore handbookprocesses proceduresmust formbe thestatistically basiscontrolled forto allmeet CAPA6 andsigma LPAreliability checklists.targets.

AuditCpk confirmsscore themust document's rules are activelybe monitored onand themaintained shopat floor.≥ 2.0 for high-risk operations.