Part 4. Final Test & Configuration
This is the decisive stage where the assembled product is fully verified for safety, function, and reliability. This is your last guarantee before shipment.
We secure quality through:
- Verification: Confirming operation (FCT) and mandatory electrical isolation (Hipot).
- Configuration: Loading firmware, provisioning IDs, and performing calibration.
- Screening: Running Burn-in to eliminate early-life failures.
This process converts final risks into auditable data and guarantees quality at launch.
5.15 Functional Testing (FCT)
Functional Testing (FCT) is the final quality gate that verifies the completed Box Build unit mee...
5.16 Safety Testing
Safety testing is a mandatory, non-negotiable step in the final assembly process that verifies th...
5.17 Firmware Loading and Device Programming
Firmware loading and device provisioning are mandatory final assembly steps that configure the el...
5.18 Calibration and Adjustment
Calibration and adjustment are mandatory final assembly steps that ensure the product's functiona...
5.19 Environmental and Burn-in Testing
Environmental Burn-In Testing is a high-stress, accelerated aging process applied to finished ele...