2.1 Chassis and Enclosure Preparation
The chassisChassis and enclosure formpreparation is the stagemandatory onfoundation whichthat everydictates otherthe partsuccess of afinal boxassembly. buildFailure mustat perform.this Theirstage geometry,— finish,neglecting andto cleanlinessverify determine whether fasteners bite correctly, gaskets compress evenly, andelectrical grounding paths workor asremove intended.machining Treatmentsdebris — introduces catastrophic latent failures like anodize,intermittent powder coat, or plating add protectionshorts and aesthetics,thermal butfailures. theyPrep alsomust introduceeliminate risks—especiallyForeign whereObject conductivityDebris or sealing is non-negotiable. By treating preparation as a controlled process rather than a formality, factories avoid a cascade of squeaks, leaks,(FOD) and electricalensure ghostsstructural thatintegrity otherwiseagainst erodeall qualitydefined andtolerances speed.before sensitive electronic sub-assemblies are installed.
2.1.1 WhyIncoming thisVisual stepand mattersDimensional (the 60-second view)Integrity
BoxAll buildsurfaces livesand orcritical diesdimensions onmust be verified against the metal/plasticdesign you start with. Clean, square parts with good threads, true gasket lands,drawing and readyquality bondspecification pointsupon makereceipt.
A) wholeSurface line calm. Dirty, chipped, or warped parts? You’ll fight squeaks, leaks, stripped screws,Grading and EMCAcceptance
- Grade
all day. Prep once, build fast.2.1.2 Finishes & materials—what to watchA (Customer-Facing): Bezels, lids, and primary label zones. Mandate: Color and gloss must be uniform; no scratches visible ataarm'sglance)length under diffuse light. - Grade B (Internal/Hidden): Bracket interiors and hidden sides. Minor cosmetic blemishes are allowed, provided they do not compromise function (e.g., no exposed base metal).
Material/Finish |
|
Powder | Thickness at threads |
Anodize ( |
|
|
|
Molded |
|
B)
Dimensional 2.1.3 Incoming visual & dimensional (grade A/B surfaces)
Grade A (customer-facing): bezels, lids, label zones.
Grade B (internal): hidden sides, bracket interiors.
Starter acceptance (tune to your spec)
Color/glossFlatness:uniformMatingonplanesGradeandA;gasketnolandsscratchesmustvisiblebeatarm’s length under diffuse light.Edge breaks: safeverified totouchbe within the drawing tolerance (no burrs/sharp).Flatnessof mating planes/gasket lands: withintypically 0.3–3 – 0.5 mm acrossspanthe(orspan).drawing).Hole patterns: ±0.2–0.5 mmto datum; slots free of powder buildup.Standoff heights: within±0.1–0.2 mm(critical boards).
Use feelers/calipersfeeler gauges and a flat plate for quick spot checks.
2.1.42 Threads, insertsInserts, &and captiveGrounding hardwareLands
The mechanical and electrical interfaces are defined by the fastener system and the bonding pads.
A) Thread and Fastener Preparation
- Thread Gauge Mandate: Thread gauges (Go/No-Go) must be used on a sample per lot and on all critical holes.
Powder/Powder coat or paintshouldmust not choke threads. - Insert Integrity:
chokePEMsthreads. PEM®/rivnuts/studs(self-clinching nuts):headand rivnuts must be fully seatedflush,flush,noshowspin;even pressmarksmarks,even;andstudsbe verified forperpendicularanti-spin(capability. Studs must be visually checked for perpendicularity using a sightwith square).Captive screws/hinge pins: retainers present; no wobble beyond spec; grease only where called out.square.- Debris
controlControl::no chips in blind holes—chase & vacuumProhibited:;avoid oilyOily taps that bleed intogaskets/labels.gasket lands. All blind holes must be chased and vacuumed to ensure zero internal chips (FOD risk).
QuickB)
torque proof: sample fastener to spec N·m without paint shear or insert spin.
2.1.5Electrical Bonding &and EMC lands (conductivity on purpose)
Lands
- Paint-
scrapeScrape Pads: Grounding pads:must be verified to be present, of therightcorrect size, anduncloggedclear of paint or anodize;.edgesEdges must be crisp (no overspray). - Continuity
checkCheck::The shell-to-land<continuity0.05–0.10mustΩbe checked with a low-ohm meter. Mandate: Resistance must be less than 0.05 – 0.10 Ω to the chassis safety ground reference point. GasketEMCframesGaskets:(conductiveConductivefoam/foam or fingerstock):stockstraight,gasketsseated,must be inspected for proper seating, alignment with fastener holes, andnotabsencecompressedofyet;compressionfastenerdamageholesprioraligned.Anodizetoislidinsulating: ensure masked bond pads or installedbond studsexist per drawing.installation.
2.1.63 Sealing, Function, and Cleanliness
These steps prepare the enclosure for environmental protection and ensure the final functional usability of doors and access points.
A) IP Readiness and Seal surfaces & IP readinessSurfaces
- Gasket
grooves/landsPreparation::clean,Gasketnolands must be clean and free of powderbeads,beads or nicks.no nicksMandate:.Wipe with lint-free+cloth and approvedsolvent.solvent (e.g., IPA). - Compression
targetsTargets: Compression must be predictable. For first articles, confirm compression targets (starter):e.g., silicone foam25–25% – 35% ofthickness;thickness)o-ringsusing15–25%—confirmawithgaugegauge/or tapetest on first article.test. - Drain
paths/Paths: Drain paths or weep holes must be checked to be clear of paint clots or weld spatter.
B) Final Mechanical Function
- Door Alignment:
clear;Hingenolinespaintmustclots.be straight, the lid must sit without rocking, and the reveal (gap) must be equal left and right. FastenerLatchpitchFunction:vsLatchessealandspec:camsallmustholesengagepresent;smoothly.noCheckcross-thread risk when compressed.
2.1.7 Cleaning & handling (keep it Class “box build clean”)
Gloveson Grade A handling;forESD straprattlewhen PCBs are near.Wipe sequence:blow offfiltered air, thenlint-free + IPA(or approved cleaner), thendry.No siliconeresidues unless design calls for it (label fish-eye risk).FOD control:parts trays with lids;FOD canat the cell; magnet sweep for steel chips weekly.Protective films: peelwith two hands, low angle,awayfrom gasket lands; bag and trash immediately.
2.1.8 Labels, adhesives & cosmetics setup
Label zonesclean, flat, and warm (≥15–20 °C). Do—atape-pullgentleonshakepaint if adhesion is suspect.Adhesive tapes(EMI/rubber feet): checkprimeror scuff area if spec’d; press time≥ 3–5 swith roller; observecure dwellif required.Touch-up paintonly onnon-sealing, non-bondGrade B areas—and only if your cosmetic spec allows (document color code). Never on gasket lands or bond pads.
2.1.9 Doors, hinges, latches & alignment
Hinge linestraight; equalmust revealleft/right; lid sits without rocking.Latch/camengages smoothly; no metal-on-metal scrape where a glide is specified.Rattle test: gentle shake—no loose captive screws orwasherwashers.buzz.- Foam bumpers must be present where
drawings call themspecified to prevent buzz.
C) 2.1.10Class Data"Box toBuild captureClean" (so problems are traceable)
Mandates
Enclosure PN/RevHandling:,vendor lotGloves,finishare mandatory for handling Grade A surfaces.type/colorESDcode,film thicknessstraps(ifaremeasured).required when PCBs or sub-assemblies are brought near.- Cleaning Sequence: Blow off with filtered air, wipe with lint-free cloth + IPA (or approved cleaner), and then dry.
- Prohibited Residue: Prohibited: Silicone residues unless explicitly called out, due to the high risk of label adhesion failure ("fish-eye") and paint contamination.
2.1.4 Data Capture and Rework Control
A) Traceability Data
The following data must be captured and stored per lot in the MES system:
- Enclosure PN/Rev, Vendor Lot, Finish Type/Color Code.
- Thread/insert audit results, bond resistance readings, flatness/standoff spot checks.
- Rework/touch-
upsup actions with photos andlocation.locationStore per lot in MES.
logs.
2.1.11B) Rework rulesRules (what’sMandate okay,vs. what’s not)
Prohibition)
Allowed (recordRecord it)It):
- Minor edge deburr.
- Thread chase to clear
coating;coatingno(must not re-tap to a larger size withoutPE/QEengineeringsign-off.release). Minoredge de-burr; tinyTiny paint touch-up on Grade Bfaces.faces, provided it is documented.- Clean/buff small scuffs on Grade A if they become invisible at
arm’arm's length.
Not allowedProhibited (scrapScrap or MRB):
- Paint or anodize on
gasket/gasket or bondlands; powder lumps in threads that won’t chase clean.lands. - Warped panels beyond flatness
spec;spunspecification. - Spun inserts or studs leaning
studs.out of perpendicularity. Through-finish corrosion, deepDeep gouges on GradeA,A surfaces or label zones that fail a tape-pull.pull adhesion test.- Any change that alters the
EMC/EMC or IP (Ingress Protection) function without engineering release.
Final 2.1.12 Common traps → smallest reliable fixChecklist
|
|
|
Grounding Integrity |
|
|
Surface Flatness |
|
|
Thread/Insert Health |
|
|
Cleanliness/FOD |
|
|
Label Adhesion Zone |
|
|
Rework Restriction | No paint touch-up or material addition on Gasket/Bond lands. |
|
2.1.13 Pocket checklists
At receiving (lot level)
PN/Rev, finish, color match PO; protective films intactGrade A scan under diffuse light; no obvious dents/scratchesSampleflatness&standoff height; record vendor/lot
Pre-build (unit level)
ThreadsGo/No-Go(critical holes), chips vacuumedInserts/studs tight & square; captive hardware retainedBond padsclean; shell-to-pad<0.1 ΩGasket lands/grooves clean; weep holes openGrade A wiped; label zones pass tape-pullFilms removed cleanly; FOD bin used
Before release to assembly
Doors/hinges align; reveals even; no rattleTouch-ups (if any) logged; none on seals/bondsData captured (lot, audits, photos if exceptions)