5.1 The TPM Strategy
OEE is the definitive metric for equipment productivity. It is calculated as the product of Availability, Performance, and Quality. The facility target for critical SMT assets is >85%. Formula: Measures Measures the speed at which the equipment runs relative to its designed cycle time. Measures the yield of Good Units produced relative to the Total Units started. Implementation relies on specific pillars tailored to the facility infrastructure. Operators are the first line of defense. AM transfers routine maintenance tasks from technicians to machine operators Time-based or condition-based maintenance performed by skilled technicians to restore equipment to original condition. Cross-functional teams analyze major losses to eliminate root causes. Manual logs are insufficient for Metric / Pillar Parameter Target / Mandate OEE Overall Target >85% Availability Changeover Time <15 Minutes Performance Speed Rating >95% Rated Speed Quality First Pass Yield >98.5% AM Operator Task Clean & Inspect Daily PM Trigger Run-Hours / Cycles Improvement RCA Trigger >60 Min Downtime Reporting Data Source Auto-MES (No Manual)OEETotal Productive Maintenance (TPM) is the operational methodology used to maximize the operational efficiency of manufacturing equipment. It shifts the paradigm from "repairing when broken" to "maintaining to prevent failure." In the context of high-volume electronics manufacturing, TPM is the primary driver for minimizing unscheduled downtime and stabilizing process capability (Cpk). This chapter defines the calculation of Overall Equipment
Effectiveness):Effectiveness (OEE) and mandates the execution of Autonomous Maintenance.Overall Equipment Effectiveness (OEE)
TheOEE formula= (Availability x Performance x Quality)Qualityand1.
howAvailability Dannie(A)calculatesit.the percentage of scheduled time that the equipment is capable of operating.Autonomous Maintenance:Calculation: (Planned Production Time - Unplanned Downtime) / Planned Production Time2. Performance (P)
(Total Count / Run Time) / Ideal Cycle Time3. Quality (Q)
(Total Units - Defective Units) / Total UnitsThe
shiftPillars inof cultureTPMwherePillar 1: Autonomous Maintenance (AM)
performto dailyensure "early detection of abnormalities.Inspect"Inspect: Operators must clean sensors, nozzles, and transport rails at the start of every shift.Pillar 2: Planned Maintenance (PM)
ratherare thantriggered waitingby run-hours (e.g., 1000 hours) or cycle counts, not calendar days.Pillar 3: Focused Improvement (Kobetsu Kaizen)
Digital Tracking & Reporting
maintenanceOEE technicians.analysis.Final Checklist