6.4 Asset Register, Criticality & Spare Parts Policy
InManaging assets in an ISO 9001/13485 environment,environment assetis managementnot extendsan beyondaccounting financialexercise; trackingit tois includea technical discipline of "Process Readiness." An uncalibrated torque driver does not just tighten a screw; it injects a latent failure into the technicalproduct. validation of process readiness. Uncalibrated tools introduce measurement errors that pass defects; aA stockout of criticala spare$50 partssensor extendsthat Meanhalts Timea to$5M Repairline (MTTR)is fromnot minutes"bad toluck"; weeks.it Thisis chaptera definesfailure of planning. We treat the mandatoryAsset protocolsRegister as the single source of truth for equipmentthe calibration,facility's critical spare parts inventory, and lifecycle tracking to ensure continuous processoperational capability.
Calibration Management (M&TE)
All measurementMeasurement and& testTest equipmentEquipment (M&TE) affecting product quality must be calibrated against NIST-traceable to NIST standards. If you cannot prove the tool is accurate, you cannot prove the product is good.
Database & Labeling
Tracking Database: A centralized digital database must track the status of every serialized tool.LabelingAction::Every tool mustbearcarry acalibrationuniquelabelIDindicating:and a "Calibration Due" label.- If Date is Expired ->
ID Number,Calibration Date,Due Date, andTechnician Initials. Lockout: Tools past their "Due Date" must be physically removed from production and locked in a quarantine cage.
Calibration Cycles:Torque Drivers: Every6 monthsThenorTool is effectively broken. Physically remove it to the "Quarantine Cage" immediately. Do not use "Just for today."5,000 cycles.Digital Multimeters: Annually.ESD Surface Resistance Meters: Annually.
-
Out-of-Tolerance (OOT) Protocol
- If
:IfToolafailstoolcalibrationis->foundThento be out of tolerance during calibration, aTrigger Reverse Impact Analysis. - Logic: You must
beidentifyconductedeveryon all productsproduct measuredwithby that tool since the lastsuccessfulpassingcalibration.date and quarantine that stock for re-verification.
Cycles vs. Time
- Torque Drivers: Calibrate every 6 Months or 5,000 Cycles, whichever comes first.
- Physics: Springs fatigue with use, not just time.
Critical Spare Parts Strategy
ToInventoryminimizeismachinecapital,downtime,butadowntimestrategicisbufferlostofrevenue.criticalThecomponentsgoalmustisbenotmaintained"Zeroon-site.Inventory"; it is "Zero Stockouts on Critical Path."Class A: Strategic Insurance
Classification:Class A (Critical)Definition::Parts thatcausestopimmediatethe linestoppage(Showstoppers)andwithhaveLeadleadTimetimes>>1 week (e.g.,conveyorConveyormotors,Motors,headCPUcontrol cards)Cards).- Mandate:
Mandate:1unitUniton-site.On-Hand at all times. - Rule: When the spare is installed, the Purchase Order (PO) for replacement is cut within 24 hours.
Class
BB:(Consumable)Consumables- Definition:
:Wear partswith(Nozzles,predictableFilters,life (e.g., nozzles, vacuum filters, belts)Belts). - Mandate:
Mandate:Min/Maxlogic based on usage.
Inventory Control:Location: Spares must be stored in a dedicated, access-controlled "MRO Cage" (Maintenance, Repair, Operations).Checkout: Parts must be electronically issued to a specific machine Work Order (WO) to track consumption costs and update inventory levels automatically.Replenishment:Trigger: Reorderpoints (ROP) must be set in the ERP system to trigger purchasingautomatically when stock hits theminimum"Min"threshold.level (Lead Time Demand + Safety Stock).
Pro-Tip: Create a "Shadow Board" for Class A spares in the maintenance cage. If the outline of the motor is visible, you are exposed. The empty shadow screams "Reorder."
Asset Lifecycle &
IdentificationConfigurationTraceabilityYouofcannotequipmentmanageconfigurationwhatisyourequireddofornotchange management.Tagging: All capital equipment (Pick-and-Place, Ovens, Printers) must have a permanent metal asset tag.Data: Asset ID, Manufacturer, Model, Serial Number, Installation Date.
Configuration Management:track. A "Machine Passport"(digital log)mustbefollowmaintainedtheforasseteachfromasset,installationrecording:to decommissioning.Configuration Control
Software/FirmwareIfVersionsFirmware/Software is updated -> Then:UpdatesValidatemustprocessbecapabilityvalidatedbeforebyreleasingProcesstoEngineering before deployment.production.HardwareRisk:Upgrades:AInstallation"minor"ofpatchnewcanheads,altercameras,servo timing orrails.location:visionCurrentalgorithms,physical location oninvalidating thefactoryReflowfloor.
Feeder Maintenance
SMT(ThecomponentHighfeedersVolumeare the highest volume asset and the leading cause of pick errors.Risk)Maintenance IntervalTrigger::Feeders must be servicedService every 1,000,000 picks or 12monthsMonths.ValidationAction::Post-maintenance validation must be performedValidate on aFeederdedicated Calibration Jigto verify index accuracy and pitch..StatusStatus:Flags:- Use visual tags: Green
:Calibrated(Ready),&RedReady. Red:(Repair),DefectiveYellow/ Needs Repair.Yellow: Due for Maintenance.
- Use visual tags: Green
Final Checklist
Asset CategoryParameter
FrequencyMetric /MandateRuleLimitCritical StateCalibration Status
TorqueExpiredDriversToolQuarantine Immediately
OOT Event
6ImpactReverse
MonthsAnalysisClass A Spares
Stock Level
Min 1 Unit
Class B Spares
Reorder Logic
Auto-Trigger at Min
Torque Tools
Interval
5,000 Cycles / 6 Mo
CalibrationFeeder ServiceOOT ActionAs OccursIntervalReverse1MImpact AnalysisPicksSparesFirmware ChangeClass A StockContinuousValidation1 Unit MinMandatorySparesAsset TaggingCheckoutPer TransactionMethodLinkUniquetoIDWork+OrderFeedersService Interval1M PicksVerify on JigEquipmentFirmware UpdateAs NeededEng Validation Req.ToolingExpired ToolsDaily CheckQuarantineBarcode - If