4.1 Governance and operating model
It
is statistically impossible to inspect 100% of incoming components (e.g., a reel of 10,000 resistors). Therefore, Incoming- Supplier Quality
ControlMission and Boundaries
What SQ guarantees (IQC)risk reliescontrol, ondefect statisticalprevention, samplingresponse) plansand definedwhat bySQ does ISO 2859-1not (ANSI/ASQ Z1.4).
The AQLown (Acceptablecommercial terms, supplier selection). Interfaces: IQC, Production, Engineering, PM.
- Supplier Quality
Limit)RACI
AQL is the maximum percent defective that can be considered satisfactory for a process average.
CriticalWhoDefectscan:(Safety/Regulatory):blockAQLincoming0.01lots,(effectivelyissueZeroSCAR,Defects).MajorapproveDefectsdeviations,(FunctionalacceptFailure):risk,AQLclose0.65correctiveoractions,1.0.MinortriggerDefectsre-audit,(Cosmetic):escalateAQL 2.5 or 4.0.stop-ship.
Execution of the Plan
LotSupplierSize:Quality Process MapDetermine total quantity received.Inspection Level:Standard isLevel II. (Use S-1 through S-4 for destructive testing).Code Letter:Use ISO 2859 table to find the sample size code (e.g., Lot of 5,000 = Code "L").Decision Rule:Code "L" requires inspecting 200 units.
Scenario:OneAQLdiagram0.65. Accept on 3 defects, Reject on 4.Outcome:If 4 defects are found, theentire lotis rejected and returned to the vendorpage (RTV)textorversion100%now):sortedQualificationatsupportthe→vendor'sincomingexpense.control → escapes → SCAR → effectiveness → monitoring → re-audit.