4.1 Governance and Operating Model

Supplier Quality Management (SQM) actsis asnot an administrative extension of Purchasing; it is the technical firewall separating external supply chain entropy from internal manufacturing stability. While Procurement optimizes for cost and logistics (Commercial), SQM must ruthlessly optimize for Risk and Capability (Technical). This chapter defines the operational architecture required to extend process control beyond the factory walls, treatingtreat external partners not as vendors, but as remote extensions of the internalyour production line.

MissionSeparation andof BoundariesPowers

The Supplier Quality Engineer (SQE) requires absolute separation of powers from Procurement to prevent the conflict of interest inherent in prioritizing "cheaper" over "compliant."

Decision Logic for Authority:

  • IfIF the issue is Technical (Capability, Risk, Specification) ->:
    • THEN SQE owns the decision.
    • Powers:
      • Exercise veto power overVeto new supplierssuppliers, based on audit results.
      • Block or Block/Quarantine suspect material immediately.material. This authority overrides production urgency to prevent catastrophic field failure.urgency.
      • Own the Supplier Corrective Action Request (SCAR) cycle from initiation to validation.
    • IfIF the issue is Commercial (Price, Terms, Logistics) ->:
      • THEN Procurement owns the decision.
        • Negotiate pricing, payment terms, and contracts.
        • SelectConstraints: theMust partnerselect partners from the SQE-qualified list.
        • Expedite late deliveries.

      Pro-Tip: Never allow "Commercial Leverage" to override a "Technical Veto." If a supplier is technically incapable, no price discount can compensate for the resulting line-down risk or recall cost.

      Authority Matrix (RACI Logic)

      Ambiguity during a quality spill is a failure mode. Adhere to the following decision logic to maintain velocity.

      • Scenario: New Supplier Qualification
        • SQE (Accountable): Validates technical capability.
        • Procurement (Consulted): Aligns commercial terms.
      • Scenario: Stop Ship / Quarantine Stock
        • SQE (Accountable): Executes the physical and digital block.
        • Operations (Informed): Adjusts production planning.
      • Scenario: Deviation Approval
        • Engineering (Accountable): Only design authority can waive a specification.
        • SQE (Consulted): Assesses risk of the deviation.
      • Scenario: Recovery Cost Negotiation
        • Procurement (Accountable): Recoups financial losses from the supplier.
        • SQE (Informed): Provides technical evidence of the failure.

      The Operating Lifecycle

      Treat the SQM lifecycle as a closed-loop control system, not a linear administrative path.system.

      Phase 1: Qualification (Pre-PO)

      • Action: Execute Risk Assessment and On-Site Audit (VDA 6.3 / ISO 9001).
      • Logic:
        • IFIf Audit Score ≥ Threshold -> Pass. Add to Qualified Vendor List (QVL).
        • IFIf Audit Score < Threshold -> Fail. Assign "Do Not Use" status to prevent PO generation.status.

      Phase 2: Incoming Control (Active)

      • Action: IQC inspects per the SQE-defined Sampling Plan.
      • Logic:
        • IfIF Compliant -> Release to Stock.
        • IfIF Non-Compliant -> Reject to MRB.

      Phase 3: Escapes & Reaction (Reactive)

      • Action: Defect detected on Line or Field.
      • Logic: Initiate Containment (24h) and issue SCAR.

      Phase 4: Resolution & Monitoring (Sustaining)

      • Action: Supplier submits CAPA.
      • Logic: Verify Permanent Corrective Action (PCA) and update Supplier Scorecard.

      Interface with Internal Stakeholders

      The SQE operates as the system architect for external quality.

      • Interface with IQC:
        • SQE (Legislator): Defines the inspection plan and limit samples.
        • IQC (Enforcement): Executes the plan.
        • Requirement: Provide clear, binary acceptance criteria. Ambiguous instructions lead to false rejects or escapes.
      • Interface with Production:
        • Requirement: If bad parts stop the line, SQE presence on the floor is required within 15 minutes to assess impact.
      • Interface with Program Management (PM):
        • Requirement: Define the "Risk Profile" for NPI. If a supplier is high-risk, mandate "Safe Launch" protocols (e.g., 100% source inspection).

      The Supplier Risk Rating Model

      Risk is a calculated score, not a feeling. Assign every active part/supplier combination a risk tier based on weighted technical inputs: Criticality (Safety/Function), Process Maturity (Auto vs Manual), Quality History (SCARs), and Complexity.

      • If Tier 1 (High Risk) -> Custom Mechanics, Safety Critical Parts, or New Suppliers (< 6 months).

      • If Tier 2 (Medium Risk) -> Standard Active Components (ICs), Connectors.
      • If Tier 3 (Low Risk) -> Standard Passives (Resistors, Capacitors), Hardware.

      Control Levels (The Response)

      Adjust "Inspection Intensity" at the receiving dock based on the Risk Tier.Intensity):

      • Level 1: Tightened Inspection (High Risk)

      • Scope: New Suppliers (NPI), Probation (Grade C),Probation, or Critical Safety Items.
      • Mandate:
        • Sampling Plan: AQL 0.4 / Level II (High sample size).
        • Documentation: Full Certificate of Analysis (CoA) with actual measurement data.
        • Safe Launch: Measure 100% of Critical Dimensions (CDs) for the first 3 lots before moving to sampling.lots.

    • Level 2: Normal Inspection (Medium Risk)
      • Scope: Established suppliers with stable performance (> 6 months w/o SCAR).
      • Mandate:
        • Sampling Plan: AQL 1.0 / Level II.
        • Checks:Check: Verification of MPN, Date Code, Packaging, and basic dimensional check.Packaging.

    • Level 3: Skip-Lot / Dock-to-Stock (Low Risk)
      • Scope: Preferred Suppliers (Grade A) providing commodities.
      • Mandate:
        • Sampling Plan: Inspect 1 out of every 5 lots.
        • Revocation: A single line-reject immediately revokes Dock-to-Stock status for 3 lots.

      Dynamic Risk Adjustment

      Performance drives the control level. The system must adapt dynamically.dynamically to performance data.

      • Escalation (Tightening):
        • Trigger: A single field failure or Line Down incident.
        • Action: Move supplier immediately to Level 1 (Tightened).
        • Exit Criteria: Minimum 3 consecutive clean lots required to de-escalate.
      • De-Escalation (Relaxing):
        • Trigger: 10 consecutive lots accepted with zero defects.
        • Action: Move supplier to Level 3 (Dock-to-Stock) to optimize IQC labor.

      Evidence & Records

      Supplier Quality Requirements Index (The "Contract")

      Do not rely on "Standard Industry Practice." Incorporate specific Standards by reference into every Purchase Order (PO). Acceptance of the PO constitutes legal acceptance of:

      1. The Drawing (2D/3D): The absolute truth (Dimensions, Material).
      2. The Specification: Performance requirements.
      3. The Quality Manual (SQM): Procedural rules.
      4. External Standards: IPC-A-610, ISO 9001.

      Evidence Submission (The "Virtual Lock")

      For Critical Tier 1 suppliers, demand evidence upfront.

      • The "Ship-to-Stock" Gate: Supplier must upload CoA and Measurement Report to the Portal before shipment leaves their dock.
      • Validation: System blocks the ASN (Advance Ship Notice) if evidence is missing or out-of-spec.

      Audit Defense and Retrieval

      Suppliers must retain records (Lot History Record, Traceability, Process Parameters) and retrieve them within 24 hours upon request.

      • If Standard: Retain 5 Years.
      • If Safety Critical / Automotive: Retain 15 Years.
      • If Medical: Retain Indefinite.

      Pro-Tip: If a supplier cannot produce the "Reflow Profile" or "Batch Traceability" within 24 hours of a field failure, they are presumed liable due to lack of process control.


      Supplier Quality Scorecard

      The Scorecard is the single source of truth for supplier performance.truth. It is generated monthly and distributed automatically.monthly.

      • Metric 1:Weighting:

        1. Incoming Quality (DPPM) – 40%: - 40% Weight
          • FormulaTarget:: (Defective Units / Total Units Received) * 1,000,000
          • Target: < 500 PPM (Passives), < 200 PPM (ICs).PPM.
          • PenaltyPenalty:: Any lot rejection triggers a "Zero Score" for this metric for the month.
        2. Metric 2: Field Escapes (Severity) – 30%: - 30% Weight
          • LogicLogic:: A single safety escape to the field is a system failure.
          • Scoring:
            • 0 Escapes = 100 Points.
            • 1 Minor Escape = 50 Points.
            • 1 Critical/Safety Escape = 0 Points (Automatic Fail).
        3. Metric 3: Response Velocity (SCARs) – 20%: - 20% Weight
          • LogicTarget:: Speed of containment and closure.
          • Target: Initial 3D (Containment) < 24 Hours; Final 8D < 14 Days.
          • Calculation: 100% - (10% deduction for every late day).Hours.
        4. Metric 4: Administrative Compliance – 10%: - 10% Weight
          • FocusFocus:: Missing CoCs, wrong labels, or late audit responses.
          • Logic: Binary. Pass/Fail per shipment.labels.

      Final Checklist

      Control Point

      Requirement / Threshold

      Non-Negotiable Rule

      Authority

      Technical Veto

      SQE can block any shipment or supplier regardless of Commercial pressure.

      New SuppliersQualification

      Audit Score

      If Audit < Threshold,Threshold Supplier= is Fail (Do Not Use).

      High Risk Control

      Inspection Level

      AQL 0.4 / Level II

      Critical Safety Items or New Suppliers must face Tightened Inspection.(Tightened).

      Safe Launch

      100% Measurement

      100% CheckFirst for first 3 lots fromof new supplier require 100% check of Critical Dimensions.parts.

      Escalation

      Trigger

      1 Failure = Level 1

      Any Line(Immediate Down/Field Failure triggers immediate return to Tightened Inspection.Tightening).

      Record RetentionRecords

      24-HourRetrieval RetrievalTime

      < 24 Hours (Failure to produce records within 24h implies liability.liability).

      BindingContract

      PO AcceptanceBinding

      PO must reference the SQM and Drawing as the primary truth.