4.1 Governance and Operating Model
Supplier Quality Management (SQM) actsis asnot an administrative extension of Purchasing; it is the technical firewall separating external supply chain entropy from internal manufacturing stability. While Procurement optimizes for cost and logistics (Commercial), SQM must ruthlessly optimize for Risk and Capability (Technical). This chapter defines the operational architecture required to extend process control beyond the factory walls, treatingtreat external partners not as vendors, but as remote extensions of the internalyour production line.
MissionSeparation andof BoundariesPowers
The Supplier Quality Engineer (SQE) requires absolute separation of powers from Procurement to prevent the conflict of interest inherent in prioritizing "cheaper" over "compliant."
Decision Logic for Authority:
IfIF the issue is Technical (Capability, Risk, Specification)->:- THEN SQE owns the decision.
- Powers:
Exerciseveto power overVeto newsupplierssuppliers,based on audit results.BlockorBlock/Quarantine suspectmaterial immediately.material. This authority overrides productionurgency to prevent catastrophic field failure.urgency.Own the Supplier Corrective Action Request (SCAR) cycle from initiation to validation.
IfIF the issue is Commercial (Price, Terms, Logistics)->:- THEN Procurement owns the decision.
Negotiate pricing, payment terms, and contracts.
SelectConstraints:theMustpartnerselect partners from the SQE-qualified list.Expedite late deliveries.
- THEN Procurement owns the decision.
Pro-Tip: Never allow "Commercial Leverage" to override a "Technical Veto." If a supplier is technically incapable, no price discount can compensate for the resulting line-down risk or recall cost.
Authority Matrix (RACI Logic)Ambiguity during a quality spill is a failure mode. Adhere to the following decision logic to maintain velocity.Scenario: New Supplier QualificationSQE (Accountable):Validates technical capability.Procurement (Consulted):Aligns commercial terms.
Scenario: Stop Ship / Quarantine StockSQE (Accountable):Executes the physical and digital block.Operations (Informed):Adjusts production planning.
Scenario: Deviation ApprovalEngineering (Accountable):Only design authority can waive a specification.SQE (Consulted):Assesses risk of the deviation.
Scenario: Recovery Cost NegotiationProcurement (Accountable):Recoups financial losses from the supplier.SQE (Informed):Provides technical evidence of the failure.
The Operating Lifecycle
Treat the SQM lifecycle as a closed-loop control
system, not a linear administrative path.system.Phase 1: Qualification (Pre-PO)
- Action: Execute Risk Assessment and On-Site Audit (VDA 6.3 / ISO 9001).
- Logic:
- IF
IfAudit Score ≥ Threshold -> Pass. Add to Qualified Vendor List (QVL). - IF
IfAudit Score < Threshold -> Fail. Assign "Do Not Use"status to prevent PO generation.status.
- IF
Phase 2: Incoming Control (Active)
- Action: IQC inspects per the SQE-defined Sampling Plan.
- Logic:
IfIF Compliant -> Release to Stock.IfIF Non-Compliant -> Reject to MRB.
Phase 3: Escapes & Reaction (Reactive)
- Action: Defect detected on Line or Field.
- Logic: Initiate Containment (24h) and issue SCAR.
Phase 4: Resolution & Monitoring (Sustaining)
- Action: Supplier submits CAPA.
- Logic: Verify Permanent Corrective Action (PCA) and update
SupplierScorecard.
Interface with Internal StakeholdersThe SQE operates as the system architect for external quality.Interface with IQC:SQE (Legislator): Defines the inspection plan and limit samples.IQC (Enforcement): Executes the plan.Requirement:Provide clear, binary acceptance criteria. Ambiguous instructions lead to false rejects or escapes.
Interface with Production:Requirement:If bad parts stop the line, SQE presence on the floor is required within15 minutesto assess impact.
Interface with Program Management (PM):Requirement:Define the "Risk Profile" for NPI. If a supplier is high-risk, mandate "Safe Launch" protocols (e.g., 100% source inspection).
The Supplier Risk Rating Model
Risk is a calculated score, not a feeling. Assign every active part/supplier combination a risk tier based on weighted technical inputs: Criticality (Safety/Function), Process Maturity (Auto vs Manual),
Quality History(SCARs),and Complexity.If Tier 1 (High Risk)-> Custom Mechanics, Safety Critical Parts, or New Suppliers (< 6 months).If Tier 2 (Medium Risk)-> Standard Active Components (ICs), Connectors.If Tier 3 (Low Risk)-> Standard Passives (Resistors, Capacitors), Hardware.
Control Levels (
The Response)Adjust "InspectionIntensity" at the receiving dock based on the Risk Tier.Intensity):- Level 1: Tightened Inspection (High Risk)
- Scope: New Suppliers (NPI),
Probation (Grade C),Probation, or Critical Safety Items. - Mandate:
Sampling Plan:AQL 0.4 / Level II(High sample size).Documentation:Full Certificate of Analysis (CoA) with actual measurement data.- Safe Launch: Measure 100% of Critical Dimensions
(CDs)for the first 3lots before moving to sampling.lots.
- Level 2: Normal Inspection (Medium Risk)
- Scope: Established suppliers with stable performance (> 6 months w/o SCAR).
- Mandate:
Sampling Plan:AQL 1.0 / Level II.Checks:Check: Verification of MPN, Date Code,Packaging, and basic dimensional check.Packaging.
- Level 3: Skip-Lot / Dock-to-Stock (Low Risk)
- Scope: Preferred Suppliers (Grade A) providing commodities.
- Mandate:
Sampling Plan:Inspect 1 out of every 5 lots.- Revocation: A single line-reject immediately revokes Dock-to-Stock status for 3 lots.
Dynamic Risk Adjustment
Performance drives the control level.The system must adaptdynamically.dynamically to performance data.- Escalation (Tightening):
- Trigger: A single field failure or Line Down incident.
- Action: Move supplier immediately to Level 1 (Tightened).
- Exit Criteria: Minimum 3 consecutive clean lots required to de-escalate.
- De-Escalation (Relaxing):
- Trigger: 10 consecutive lots accepted with zero defects.
- Action: Move supplier to Level 3 (Dock-to-Stock) to optimize IQC labor.
Evidence & RecordsSupplier Quality Requirements Index (The "Contract")Do not rely on "Standard Industry Practice." Incorporate specific Standards by reference into every Purchase Order (PO). Acceptance of the PO constitutes legal acceptance of:The Drawing (2D/3D):The absolute truth (Dimensions, Material).The Specification:Performance requirements.The Quality Manual (SQM):Procedural rules.External Standards:IPC-A-610, ISO 9001.
Evidence Submission (The "Virtual Lock")For Critical Tier 1 suppliers, demand evidence upfront.The "Ship-to-Stock" Gate:Supplier must upload CoA and Measurement Report to the Portalbeforeshipment leaves their dock.Validation:System blocks the ASN (Advance Ship Notice) if evidence is missing or out-of-spec.
Audit Defense and RetrievalSuppliers must retain records (Lot History Record, Traceability, Process Parameters) and retrieve them within24 hoursupon request.If Standard:Retain 5 Years.If Safety Critical / Automotive:Retain 15 Years.If Medical:Retain Indefinite.
Pro-Tip: If a supplier cannot produce the "Reflow Profile" or "Batch Traceability" within 24 hours of a field failure, they are presumed liable due to lack of process control.Supplier Quality Scorecard
The Scorecard is the single source of
truth for supplier performance.truth. It is generatedmonthly and distributed automatically.monthly.Metric
1:Weighting:- Incoming Quality (DPPM) – 40%:
-40% WeightFormulaTarget::(Defective Units / Total Units Received) * 1,000,000Target: < 500 PPM (Passives),< 200PPM (ICs).PPM.PenaltyPenalty::Any lot rejection triggers a "Zero Score" forthis metric forthe month.
Metric 2:Field Escapes (Severity) – 30%:-30% WeightLogicLogic::A single safety escapeto the field is a system failure.Scoring:0 Escapes = 100 Points.1 Minor Escape = 50 Points.1 Critical/Safety Escape= 0 Points (Automatic Fail).
Metric 3:Response Velocity (SCARs) – 20%:-20% WeightLogicTarget:: Speed of containment and closure.Target:Initial 3D (Containment) < 24Hours; Final 8D < 14 Days.Calculation: 100% - (10% deduction for every late day).Hours.
Metric 4:Administrative Compliance – 10%:-10% WeightFocusFocus::Missing CoCs, wronglabels, or late audit responses.Logic: Binary. Pass/Fail per shipment.labels.
- Incoming Quality (DPPM) – 40%:
Final Checklist
Control Point
Requirement / Threshold
Non-Negotiable Rule
Authority
Technical Veto
SQE can block any shipment
or supplierregardless of Commercial pressure.New SuppliersQualificationAudit Score
If Audit<Threshold,ThresholdSupplier=isFail (Do Not Use).High Risk
ControlInspection Level
AQL 0.4 / Level II
CriticalSafety Items or New Suppliers must face Tightened Inspection.(Tightened).Safe Launch
100%Measurement100% Check
Firstfor first 3 lotsfromof newsupplier require 100% check of Critical Dimensions.parts.Escalation
Trigger
1 Failure = Level 1
AnyLine(ImmediateDown/Field Failure triggers immediate return to Tightened Inspection.Tightening).Record RetentionRecords24-HourRetrievalRetrievalTime< 24 Hours (Failure
to produce records within 24himpliesliability.liability).BindingContractPO AcceptanceBindingPO must reference
theSQMand Drawingastheprimary truth.