5.7 Defect Taxonomy & Disposition Rules (Linked to MRB)
Ambiguity in defect classification paralyzes production lineslines. If an operator cannot instantly distinguish between a "process indicator" and allows latent failures to escape. A subjective debate over whether a scratch"functional isfailure," "Minor"they will either scrap good parts (wasting money) or "Major"pass wastesbad engineeringparts hours(risking and degrades the baseline for acceptable quality.liability). This chapter establishes a rigid,binary, physics-based taxonomy for non-conformities and defines the exactrigid logic path for their disposition,disposition. removingWe remove emotion from the decision process.process: the physics of the defect determines its fate, not the schedule pressure.
Defect Severity TaxonomyClassifications
Classify defects based on their impact on Safety,Safety, Function,Function, and Assembly,Assembly, not on the costcomponent of the component.cost.
Critical Defect (Severity 1)
- Definition: The deviation renders the product
unsafeunsafe, illegal, orlegally non-compliant.hazardous. Impact:Physics/Risk:Risk of injury, fire, shock, or regulatory violation (e.g., creepageCreepage distance violation, exposed livepart,parts, toxic materialpresence).(RoHS failure), or lithium battery damage.- Action:
- If Critical Defect is found
->ThenQuarantine entire lot immediately. IfRoot Cause is not identified ->→ Then Stop Ship / StopBuild.Build immediately.- If root cause is unknown → Then Quarantine the entire lot and upstream inventory.
- If Critical Defect is found
Major Defect (Severity 2)
- Definition: The deviation results in functional failure or prevents proper assembly (Form/Fit/Function).
- Physics/Risk: Open circuits, short circuits, dimensional interference, or significant reduction in
usability/reliability.Impact:Product does not work,anticipated life-cycle is compromised, or unit cannot be assembled (Fit/Form/Function failure).cycle.- Action:
- If
functional/reliabilitydefectriskaffects->function → Then Reject unit. - If
systemicdefect(rate > AQLlimit)limit->→ Then Trigger SCAR (Supplier Corrective Action Request).
- If
Minor Defect (Severity 3)
- Definition:
TheA deviationis cosmetic or a slight departurefromspecificationsstandards that does not affect Function orSafety.Safety, often cosmetic or a slight process drift. Impact:Physics/Risk: Visualimperfectionimperfections not visible to the end-user, orminordimensionaldeviationdeviations within tolerance stacking limits.- Action:
- If defect
doesisnotinvisibleaffectto customerperception ->→ ThenCountLogagainstfor process control (yield tracking) but continue processing. - If accumulation of
minor defectsminors exceeds visualstandardlimit->→ Then Reject.
- If defect
Pro-Tip: Do not confuse "Minor" with "Acceptable." A Minor defect is still a non-conformance. If
theyour process produces frequent Minor defects,theyourprocess capability (Cpk)CpK isdegrading.degrading, and a Major defect is inevitable.Disposition Logic Gates
Once
aclassified, the defectismustclassified,beexecuteprocessed. Use this logic to determine thedispositionphysicalbasedpathonof thefollowing logic gates. Do not invent new categories.hardware.1.RTV (Return to Vendor)- Trigger: Incoming material fails AQL
inspection or functional testing.inspection.
- Logic:
- If
partcomponentiscostcheaper<thanshipping/inspection cost->→ Then Scrapatlocally and credit note (with vendorexpense.agreement). - If stock is
criticalzeroforandcontinuityline->is down → Then 100%SortSort/Screen (charge labor back to vendor).
- If
2.Scrap- Trigger: Non-recoverable
non-conformancefailure where reworkis impossible or costscost > 50% of unitvalue.valueor physics prohibits repair.
- Logic:
- If
structuralPCBintegritysubstrate iscompromisedcracked,(e.g.,burned,crackedorPCB,delaminatedbent chassis) ->→ Then Scrap.DO(StructuralNOTintegrity is gone; do not attemptmechanicalrepair). - If
straightening.Intermetallic Compound (IMC) is compromised by excessive heat cycles → Then Scrap.
- If
3.Rework (Standard)- Trigger: Deviation can be corrected to
meet original specificationsspec using avalidatedpre-validated,process.documentedprocess (e.g., IPC-7711).
- Logic:
- If
reworkaprocessStandard Operating Procedure (SOP) existsand is documented ->→ Then Execute Rework. - If
reworknorequiresSOPunprovenexistsmethodsor(e.g.,"creative"jumpersolderingwiresisonrequireda final board) ->→ Then Stop. Escalate to MRB.
- If
4.UAI (Use As Is)- Trigger:
DeviationComponent isoutsideoutspecof spec, butposesEngineering validates zerofunctional or reliabilityrisk. - Logic:
- If
dimensiondeviation isoutpurelyofcosmetictoleranceon an internal surface → Then UAI. - If deviation reduces margin (e.g., 5% less capacitance) but
fitscircuitmatingremainspartstable->→ Then UAI (requiresRequiresEngineeringsignedApproval)deviation). Ifvisual blemish is on internal surface ->ThenUAI.
- If
The Material Review Board (MRB)
TriggersThe MRB is the "Supreme Court" of quality. It is not a
committeedailyformeetingapprovingtobadapprovequality;sloppy work; it is a risk assessment body for complex dispositions.Only escalate to MRB when the standard disposition logic fails or high-value risks are involved.EscalateWhen toMRBTriggerIF:MRB:- Structural Modification:
TheDispositionproposedrequiresdispositioncuttingchangestraces, drilling holes, or adding jumper wires (changing theFit, Form, or Function (e.g., drilling new holes, cutting traces)"Form"). - Reliability Risk: The defect might degrade long-term performance (e.g.,
oxidizedcorrosion,contacts,slight moisture exposure). - High Value: The scrap cost
of scrapexceeds thepre-definedthreshold (e.g., > $5,2,000). - Customer Impact: The deviation
mightrequiresbeanoticeablepermanent change to thecustomer,drawingrequiringor adeviationcustomer waiver.
MRB
Output Requirements:Output:- Technical Justification:
Physics-A physics-based reason why the deviation is acceptable. - Containment:
PlanA plan to preventfurthertheproductiondefectoffromthis defect.recurring. - Expiry: The decision applies only to the specific serial numbers
or lot identified.listed. Itdoesis notsetaprecedentpermanentforrulefuture production.change.
Final Checklist
ParameterControl PointRuleCritical/RequirementRisk
ThresholdAvoidedCritical Defect
ActionImmediateStopBuild;BuildQuarantineauthorityLot.delegated to Quality Techs.Major Defect CriteriaFailsSafetyFunction,/Fit,Regulatoryor Safety.LiabilityRework
ConstraintLimitsAllowedMaxonly2withattemptsvalidated,perdocumentedjoint/location.PCBA
instruction.Delamination / Pad LiftMRB
Trigger (Cost)ThresholdScrap valueCost >[Insert$X,XXXThreshold,ore.g.,Safety/Reliability$1,000].Risk.MRB Trigger (Risk)AnyFinancialriskLossto/ReliabilityFieldor Safety.FailureUAI
DocumentationAuthorityMustRequiresincludeEngineeringsignature&andQualityexpirationManager(Lot/Qty).Sign-off.Unauthorized Design Change
DispositionScrapTime LimitLogicNon-conformingStructuralmaterialdamagemust(Cracks/Burns)be=dispositionedMandatorywithinScrap.Latent
48Fieldhours.FailureTraceability
All MRB/Rework actions recorded by Serial Number.
Recall Management