7.1 Operational Metrics: FPY, RTY, CoQ & Review Cadence

In high-volume manufacturing, standard "Yield" is a vanity metric. A production line reporting 99% Output Yield can still be bankrupting the company if 40% of those units required rework loops to pass. As a Quality Director, you must distinguish between making product and fixing product. Operational metrics are not just for accounting; they are the pressure gauges of the "Hidden Factory"—the invisible rework engine that consumes labor and reduces component reliability.

The Metrics Hierarchy

1. First Pass Yield (FPY) – The Capacity Metric

FPY measures the efficiency of a single station. It answers: "How many good units came out versus how many went in?"

  • Formula: (Units Passed / Units Entered) *× 100
  • Use Case: Capacity Planning. It tells you if you can meet the shipping schedule.
  • The Danger: FPY allows rework. If an operator re-tests a board 3 times to make it pass, FPY sees a "Pass." It hides the instability.

2. Rolled Throughput Yield (RTY) – The Reliability Metric

RTY measures the probability of a unit passing the entire value stream without a single touch-up, rework, or re-test. This is the truth metric.

  • Calculation: RTY = Y(print) × Y(place) × Y(reflow) × Y(test)
  • The Math of Failure:
    • If you have 5 process steps, each at 95% yield (which sounds good):
    • RTY = 0.95 × 0.95 × 0.95 × 0.95 × 0.95 ≈ 77%.
    • Reality: Nearly 1 in 4 units are being reworked. This is why "95% yield" is unacceptable in complex systems.

3. Cost of Quality (CoQ) – The Financial Metric

Quality is not free, but Poor Quality is expensive. CoQ is the total financial impact of the quality system.

  • * Good Cost (Investment):
    • * Prevention: Training, FMEA, Fixture Design.

    • * Appraisal: Calibration, Testing, Inspection labor.

    • Bad Cost (Loss):
      • Internal Failure: Scrap, Rework, Re-testing, Downtime.
      • External Failure: RMA, Warranty, Liability, Brand Damage.

    Pro-Tip: The Rule:rule of thumb is 1-10-100. $1 spent on Prevention saves $10 in Correction and $100 in Failure.

    Review Cadence (The Pulse)

    Data without a review schedule is just digital noise. Establish the following cadence to turn metrics into action.

    1. Daily (Tactical Review)

    Who: Line Lead, Quality Engineer, Production Supervisor.

    Trigger: Shift Start / Shift End.

    Focus: FPY & Scrap.

    • Logic:
      • If Top 3 Defects are the same as yesterday -> Then Stop Line. The containment failed.
      • If Scrap > $500/shift -> Then Quarantine the bin for Root Cause Analysis (RCA).

    2. Weekly (Corrective Review)

    Who: Quality Manager, Engineering Manager, Operations Manager.

    Trigger: Monday Morning Meeting.

    Focus: RTY & Open CAPAs.

    • Logic:
      • If RTY trend is down (despite stable FPY) -> Then Audit the rework stations. Operators are fixing defects without logging them.
      • If CAPA is overdue -> Then Assign resources immediately.

    3. Monthly (Strategic Review)

    Who: VP of Operations, Plant Director, Quality Director.

    Trigger: Monthly Operations Review (MOR).

    Focus: CoQ & Supplier Performance.

    • Logic:
      • If Failure Cost > Appraisal Cost -> Then Your process is reactive. Shift budget from "Inspection" to "Prevention" (Training/Jigs).

    Decision Logic: Which Metric When?

    • IFIf you are measuring Line Throughput (can we ship?): ->
      • THENThen Monitor FPY.
    • IFIf you are measuring Process Stability (is the process healthy?): ->
      • THENThen Monitor RTY. A drop in RTY precedes a drop in FPY.
    • IFIf RTY < 90%: ->
      • THENThen Stop the line. The rework loop is introducing latent thermal stress to the components (reducing life).
    • IFIf CoQ > 5% of Revenue:Revenue ->
      • THENThen The process is economically unsustainable. Initiate major Corrective Action.

    Final Checklist

    MetricParameter

    FocusRule Area

    Critical/ Warning Sign

    Strategic ActionThreshold

    FPY Target

    Single Station Output

    > 98% butper Highstation OT

    Investigate(typical re-testing loopsSMT).

    RTY Alert Limit

    System< Integrity90% triggers Engineering intervention.

    <Daily 90%Review

    StopReview LineTop &3 FixPareto Rootdefects Causebefore shift start.

    Weekly Review

    Review RTY trends and CAPA closure rate.

    Monthly Review

    Review CoQ ratios (Prevention vs. Failure).

    Scrap Limit

    Material Loss

    Variance > 0.5%

    Audit Redrequires Bins / Trashexplanation.

    CoQData Integrity

    FinancialManual Health

    Failuremodification Costof >test Appraisal

    Shiftlogs budgetis togrounds Prevention

    DPMO

    Processfor Capability

    Rising Trend

    Review Training/Calibrationdismissal.