9.4 Internal MRB & Quarantine Discipline

The Material Review Board (MRB) process is not a "repair shop" or a storage room for mistakes; it is a crime scene investigation. Every item in the MRB cage represents a failure of the process controls upstream. As a Quality Director, your mandate is simple: Segregation must be absolute. If a non-conforming part can be physically mistaken for a good part and re-introduced to the line, your Quality System has already failed. MRB is the "Air Gap" between a production anomaly and a customer escape.

Physical Segregation (The Red Cage)

Quarantine is not a status in the ERP system; it is a physical reality. Electronic blocking is insufficient because operators do not read SAP screens when grabbing a reel from a cart.

The "Red Cage" Standard:

  • Physical Barrier: The Quarantine area must be a locked cage or a distinct room with controlled access.
  • Visual Logic: All MRB material must be tagged with a RED "Non-Conforming" label immediately upon detection.
  • Inventory Gap:
    • IF material is physically in the cage:
    • THEN it must be electronically transferred to the "MRB" or "Blocked" storage location in ERP.
    • Risk: If the physical and digital states drift, Planning will schedule production against bad inventory, causing line-down events.

The MRB Hierarchy (Disposition Logic)

The MRB is a decision-making body, not a committee for debate. The Quality Manager holds the casting vote. Use the following logic to disposition material efficiently:

  • Disposition: Return to Vendor (RTV)
    • Trigger: Supplier defect confirmed.
    • Action: Issue SCAR + Debit Memo. Move to Shipping Dock within 48 hours.
  • Disposition: Scrap
    • Trigger: Product cannot be recovered economically or safely.
    • Action: Mutilate before disposal. Do not just throw PCBs in a dumpster; they will be harvested for components on the gray market.
  • Disposition: Rework
    • Trigger: Recoverable process defect (e.g., missing screw, cold solder).
    • Requirement: A documented Rework Instruction (WI) must be approved by Engineering before touching the unit. "Fix it" is not an instruction.
  • Disposition: Use As Is (UAI)
    • Trigger: Cosmetic defect or minor deviation that affects form but not fit/function.
    • Requirement: Mandatory Engineering Deviation signed by the Design Authority. Quality cannot approve UAI alone.

MRB Aging & Velocity

The most common failure mode of an MRB system is the "Graveyard Effect"—parts enter and never leave. This hides WIP costs and obscures yield data.

The 30-Day Hard Stop:

  • IF a discrepancy remains open > 30 days:
    • THEN it defaults to SCRAP.
    • Logic: If Engineering or the Supplier hasn't cared enough to resolve it in a month, the material is effectively dead. Stop paying to store it.
  • Metric: Measure "Average Days in MRB." Target < 7 Days.

Scrap Security (Grey Market Protection)

High-value silicon and sub-assemblies are targets for theft. Scrapped material must be treated as "Hazardous Waste" in terms of chain of custody.

  • Protocol: High-value scrap (CPU, Memory, Completed PCBAs) must be witnessed destroyed.
  • Certificate of Destruction (CoD): Required for all proprietary or branded material.

Final Checklist

Control Element

Requirement

Critical Rule

Access Control

Physical Lock

Quality Personnel Only (Key/Badge access)

Identification

Tagging

Red Tag attached immediately upon failure

UAI Decision

Deviation

Engineering Signature Required (No verbal approvals)

Aging Limit

Velocity

> 30 Days = Automatic Scrap

Rework

Documentation

Approved WI Required before work begins

Disposal

Security

Mutilate/Crush to prevent resale