5.1 Receiving & Identification
The receiving dock is not just where boxes land; it is the Process Firewall. This is the single control point where raw materials first gainacquire their manufacturingofficial identity.factory identity, and the first critical check against supplier quality issues occurs. Every reel, tray, paste jar, and PCB passesmust throughpass this gateway,gateway. whereWhen condition is verified, data captured, and risks screened before entering controlled storage. Doneexecuted with discipline, receiving notsecures onlythe complete traceability backbone and prevents hiddencostly material defects from slippingever downstream but also establishesreaching the traceabilityproduction backbone that later quality checks depend on. It is the moment when supplier packaging becomes factory-certified inventory, ready for predictable and stable use.floor.
5.1.1 PurposeThe Digital Gate: System Validation & scopeID
GetBefore everyany inboundmaterial item—fromis reelsprocessed andphysically, traysit tomust solder paste and bare PCBs—intopass the systemdigital cleanly:gate. identityThe confirmed,receiving conditionoperator’s checked,primary risks flagged, and storage-ready. Thisrole is thethat firstof linka inData traceability;Integrity do it right and the line runs calm.Specialist.
5.1.2 The receivingCore rhythm (step-by-step)
Mandate
StageSystemsafely.Check First:UseBeforeanopeningESD-safeanybenchpackage, the operator must validate the supplier's Part Number (PN), Lot Code, andcartsQuantity against the expected Purchase Order (seePO)5.3)data in the MES/ERP system.Don’t cut near Moisture Barrier Bags (MBBs).VisualThecheckUID(outer).is the Passport:CartonOnceintact, no water marks, no crushed corners. If damaged,photo + quarantine(5.1.6).Unpack to the item level.Handle reels/trays/tubes/paste jars gently; keep anti-static wraps on.Label read & compare.MatchPO → PN → description → revision; checkquantity & unit(REEL/TRAY/TUBE/EA).Record the essentials into MES/ERP:PN(internal),supplier PN,descriptionLot/Date code(e.g., YYWW),qty,UoMMSL(if present),expiry(paste/flux/adhesives),finishfor PCBs (e.g., ENIG/OSP)Supplier,COC#if providedInitial state=SEALED(unless bag already open)
Integrity check (item).ForMSDs: MBB present, seal straight, no punctures,HIC & desiccant visible(donotopen here; opening lives in 5.4).Forpaste/flux: jar/cartridge intact,storage temp labelreadable, expiry in future.ForPCBs: vacuum wrap intact, no corner dings, correctrev/finish.
Assignvalidated, auniqueUnique ID (UID).Printlabelanis printed. This internal 2Dlabelcode (DataMatrix/DataMatrix or QR)thatistiesthe material's factory passport, linking the physicalitemcomponent to its complete digital history in theMES record.system.PlaceStatuslabels correctly.Sync:OuterThecartonMES/ERP+recordimmediateimmediatelycontainerassigns(reelthehubinitialor tray corner). Never cover supplier labels, MSL triangles, or HIC windows.Put-away.Route by type:status—usuallyMSDsSEALED→—drywhichcabinetdictates(5.2),itspaste/fluxhandling→andcoldshelfchainlife.
Data
Accurate racking
5.1.3 What the UID label says (and where it goes)
Fields (human-readable + 2D code):
UID(system-generated)PN / Description / RevLot/Date codeQty & UoM(e.g., 5,000 EA / REEL)MSL(if applicable) &Initial State= SEALED / OPEN / DRY-PACK (RESET) / QUARANTINEExpiry(for chemistries)Received date,operator,site/warehouse bin
Placement guide:
Reels:On thehub face, edge-aligned; readable through feeder bank windows.Trays/Tubes:Top-right corner, not blocking cavities or latch.MBBs:Above the seal, never over the seam or the HIC window.Paste/Flux:On thesidewall, not the lid; leaves room for thaw/mix stickers (5.5).Cartons:One face + one adjacent face for easy scanning on the rack.
5.1.4 Data yourecord must capture (bythe materialfollowing type)
essentials to ensure compliant storage and process stability:
Material Type | Required Data Points (Must |
|
MSD | PN, | Drives the moisture clock and |
PCBs ( | PN, |
|
Solder | PN, |
|
| PN, |
|
5.1.2 The Receiving Rhythm: Inspection and Labeling Flow
The physical process moves in a continuous, controlled flow: Unpack – Inspect – ID – Route.
Inspection
Integrity
5.1.5Stage StatusSafely: statesPlace materials on an ESD-safe bench. Handle component packaging gently; never cut near Moisture Barrier Bag (whatMBB) seals.- Visual Check: Confirm the
systemshipping shouldcarton say)
is SEALEDintact—(noFactorycrushing,packpunctures,intact;ormoisturewaterclocknot startedmarks).OPENPhysical Integrity:—UnpackPacktheopened;itemmoistureto its unit level (reel, tray, tube). Perform the integrity check:- MBBs: Must be sealed.
floorHIClife(HumidityrunningIndicator Card) and desiccant must be visible and undamaged. (5.4)Do not open MBBs at receiving.) - Chemistries: Jars/cartridges must be intact, and the expiry date must be well in the future.
- PCBs: Check the vacuum seal and confirm the correct finish and revision.
- MBBs: Must be sealed.
- Placement Rule: The UID goes on the immediate container (reel hub, tray corner, jar sidewall).
DRY-PACKCritical(RESET)Constraint:—PlaceResealedtheafterUIDqualifiedbeside,bake;nottimerover,resetthe supplier's lot code, MSL triangle, or any original quality markings. Covering essential supplier data breaks traceability.- Red Tag and move the material to QUARANTINE
— Hold for review/MRB; do not issue. SCRAP— Not for use; dispositioned in MRB.
UID Labeling Standard
The UID label must be printed from the MES/ERP only after the integrity check is passed and the record is complete.
Final Routing
Materials are routed immediately based on their sensitivity: MSDs – Dry Cabinet (5.4).2); Paste/Flux – Cold Storage (5.5); Others – ESD Racking.
5.1.3 Immediate Risk Stop: Quarantine and MRB Authority
If any incoming material fails an integrity check, is damaged, or its identity is questionable, the process stops. The operator must issue a
These states sync to labels so operators don’t guess.immediately.
What
Triggers
5.1.6a Quarantine (whatRed earnsTag):
a- Any
redphysical tag)
damage Quarantine immediately if you see: (crushed cartons, torn MBBs,MBBs).missing HIC/desiccant, wrong revision/finish, expired paste/flux, mixed lots in one reel, wrong quantity vs PO,HIC or desiccant from an MBB.
Managerial 6.5).Action (IMD/MRB)
Quarantine requires two simultaneous actions:
Action:Logging:photoCreate→an Incoming Material Defect (IMD) ticket→insegregatedtheshelf/binsystem,→includingsupplier/qualityphotosnotified.of the issue. This data feeds directly into the Supplier Quality Rating (SQR).- Authority: Nothing leaves quarantine without formal disposition from the
MRBMaterialdispositionReview Board (MRB).
The
receiving
operator's5.1.7responsibility is to stop the material and notify Quality/Engineering.
Acceptance cuesCues (fastFast table)Table)
Area | Accept Criteria (Go) | Reject Criteria (Stop) |
Identity | PN/ | PN mismatch; |
| ||
MBB sealed; HIC & desiccant | Torn MBB; | |
Condition | Carton and inner packs clean/intact. | Crushed, wet, punctured, seal wrinkled. |
Chemistries | Expiry date is in | Expired; |
| ||
UID label printed; MES | Handwritten labels only; |
5.1.4
Common Traps and Reliable Fixes
5.1.8 Common traps → smallest reliable fix
Trap | Symptom | Smallest Reliable Fix |
Opening MBB "just to check" | Moisture clock starts early, wasting floor life. | Do Not Open. Rely on visual check through the bag. |
Covering supplier data | Can’t read MSL/lot later during kitting. | Place UID |
| ||
Traceability is broken and confused. | Separate UIDs by | |
No photos on damage | Supplier | Photo all six sides |