5.4 MSD Handling & Baking
Start/stopMoisture
floor-lifedamage clocks,is manageone on-feederof exposure,the bakemost ICs/PCBsdeceptive safely,threats andin reseal/resetelectronics right.
Moisturelook fine until reflow, when trapped vapor explodes into cracks, pad lifts, or hidden reliability risks. The defense is a quietdisciplined failuresystem modeof inclocks, assembly: plastic-packaged ICscabinets, and evencontrolled barebakes. PCBsBy absorbtracking humidity,floor then at reflow trapped steam expands and cracks packages (“popcorning”) or lifts pads. MSD (moisture-sensitive device) control hinges on the device’s MSL (Moisture Sensitivity Level, per J-STD-033/020) and a simple floor-life clock that startsfrom the moment packaging is opened. That clock only truly pauses in an MBB (moistureis barrieropened, bag)pausing withit desiccantonly in true dry storage, and aresetting readableit HICcorrectly (humidityafter indicatorqualified card),baking, orfactories inside a DRY-CAB (dry cabinet, ≤10% RH). Baking—at profiles safe for components or boards—drives out absorbedkeep moisture and, when qualified, restores full floor life. The sections ahead align roles and checkpoints from receiving through rework so moisture becomes a managed variable,variable notinstead of a last-minutesilent defectsaboteur. factory.
5.4.1 Terms you’ll see
- MSL: Moisture Sensitivity Level per J-STD-033/020.
- Floor life: Allowed time at ≤30 °C / 60 % RH after an MBB is opened.
- MBB / HIC / Desiccant: Moisture barrier bag, humidity indicator card, and drying agent.
- DRY-CAB: Dry cabinet (≤10 % RH, ≤5 % preferred) that pauses floor life.
5.4.2 MSL levels (1–6) — quick reference
(Floor life at ≤30 °C / 60 % RH; always defer to the device label/datasheet.)
Good to know
- Floor-life pauses only in a sealed MBB or ≤10 % RH dry cabinet (5.4.5).
- After a qualified bake (5.4.9), the device returns to full floor life for its MSL when resealed (DRY-PACK (RESET)).
- MSL ≠ shelf life. MSL is moisture exposure after opening; chemical shelf life lives in 5.5.
- Read the MSL triangle label and HIC on every open (5.4.4); if the HIC low-% spot is wet, treat as expired and follow 5.4.8.
- For PCBs, apply the same logic when moisture-loaded (OSP especially); see PCB bake notes in 5.4.9.
5.4.3 Where things happen (area roles)
- REC-STAGE / BULK-PARTS: Transit only; do not open MBBs here (5.2).
- CMP-STORE (EPA): Open/inspect MBBs, read HICs, apply UID/line labels, DRY-CAB storage (5.1/5.2).
- LINE-SMKT (EPA): Kitting/feeding; manage exposure; cabinet-park feeders for pauses (5.2).
5.4.4 Opening an MSD pack (start the clock right)
- Prep in CMP-STORE: ESD on (5.3), UID ready (5.1).
- Open MBB cleanly; immediately read HIC.
- OK: low-% spot still “dry” color → proceed.
- Caution: mid/high spots turned → proceed but note.
- Wet: low-% spot shows “wet” → treat as expired → go to Bake decision (5.4.8).
- Start the floor-life timer in MES at the moment of opening; apply visible line label with remaining hours.
- Unused remainder back to DRY-CAB or reseal (5.4.10).
5.4.5 What pauses vs runs the timer
- Timer RUNS whenever parts are at ambient (benchtop, kitting table, mounted on feeders, carts).
- Timer PAUSES only when either:
- The pack is sealed in an MBB, or
- The parts are fully inside a DRY-CAB ≤10 % RH.
Zip bags and “covered boxes” don’t count unless your site has qualified them—assume no.
5.4.6 On-feeder exposure, shift hand-off, and changeovers
- Mounted on a machine = timer runs.
- Pausing across breaks or shifts: either cabinet-park the feeder+reel in a DRY-CAB with feeder slots, or reseal the reel and remove it.
- Night holds: never leave MSDs mounted at ambient overnight.
- Kitting discipline: issue shift demand + buffer; keep the rest sealed/dry.
- Visual control: every reel/feeder shows remaining hours; supervisors verify at hand-off.
5.4.7 Rework & re-exposure (don’t popcorn at hot-air)
- Assemblies before hot-air/BGA/QFN work: if they’ve seen ≥1 day ambient or suspect humidity, pre-bake the assembled PCB (5.4.9) to avoid popcorning/pad lift.
- Salvaged MSDs: unless kept dry from first opening, treat as expired; default is scrap or tray-rebake if device and tracking allow.
- Cumulative exposure: add rework exposure to the device’s timer; if it exceeds floor life, bake then reseal/reset before reuse.
5.4.8 Bake decision (simple rule)
Bake if any of these are true:
- Floor life expired or will expire before next use.
- HIC low spot wet on opening.
- Evidence of compromised storage (torn MBB, humidity excursion, unknown history).
- Pre-rework bake required as above.
Otherwise, continue with timer rules.
5.4.9 Bake profiles (ICs vs PCBs; pick the safest that works)
Always check the device/packaging ratings. Some carrier tapes, labels, or elastomers can’t take heat.
ICs / components
- Preferred (in trays/tubes): 125 °C dry bake; duration per site table (typ. 24 h for MSL3+; longer for higher MSL).
- If still in tape-and-reel:
- Many tapes soften at 60–90 °C. Choose low-temp/long-time (40–60 °C, ≤5 % RH, extended hours), or re-tray parts suitable for 125 °C and bake.
- Many tapes soften at 60–90 °C. Choose low-temp/long-time (40–60 °C, ≤5 % RH, extended hours), or re-tray parts suitable for 125 °C and bake.
- MSL6: follow label exactly (mandatory bake and mount-within time).
PCBs (bare or assembled)
- General FR-4: 105–125 °C, 2–8 h based on thickness/storage history.
- OSP finish: prefer lower temp, longer time (e.g., 105 °C) to protect finish.
- Assembled boards for rework: ~105 °C for 4–8 h; mask or remove heat-sensitive labels, elastomers, bezels.
- Heavy copper/thick boards: choose longer times.
After bake
- Cool to ≤30 °C in dry conditions before reseal or immediate use; don’t open-air cool in humid rooms.
5.4.10 Reseal & reset (MBB done right)
- Bag: Use qualified MBB sized for minimal free volume; no pinholes.
- Desiccant: Fresh, in-date; mass matched to free volume per site table; distribute evenly.
- HIC: New card placed on top, visible at next open.
- Purge (optional): Short dry N₂ purge; don’t crush sharp edges.
- Seal: Straight, 10–12 mm heat seal; wrinkle-free; quick squeeze test for leaks.
- Label (outside): PN, lot/date, MSL, state (DRY-PACK (RESET) or REMAINING x h), open time, reseal time, remaining time if not baked, operator/workstation.
- Reset logic:
- After a qualified bake → timer resets to full floor life.
Reseal without bake → timer stays at remaining hours.
- After a qualified bake → timer resets to full floor life.
5.4.11 Data & traceability links
- Every reel/tray/tube has a UID (5.1) bound to MSL, timer state, bake/ reseal events, and feeder IDs while mounted.
- Rework tickets carry added exposure and any pre-bake performed.
- Pack labels mirror the MES state—so operators don’t guess.
5.4.12 Acceptance cues (fast table)
5.4.13 Common traps → smallest reliable fix
5.4.14 Pocket checklists
Open & stage (CMP-STORE)
- ESD on; open MBB; read HIC
- Start MES timer; apply remaining-hours label
- Remainders to DRY-CAB or reseal
On the line
- Issue shift demand + buffer; cover reels
- Pauses: cabinet-park feeder or reseal
- Supervisor verifies remaining hours at hand-off
Bake & reseal
- Profile matches device & medium
- Cool dry; fresh desiccant + HIC; straight seal
- Label with state/times; reset only if baked; MES updated
Rework
- Pre-bake assemblies if ambient-exposed
- Salvaged MSDs handled per policy (rebake/scrap)
- Added exposure logged on ticket
BottomFollowing
these handling, baking, and resealing rules transforms moisture line:isfrom a timerlurking withfailure rules.mode Startinto ita whenpredictable youparameter. open,The pausepayoff itis onlysmooth whenreflow, trulyhigher dry, pre-bake before hot ops, reseal/reset with full labeling. Do that,yields, and reflow-sideproducts gremlins—popcorning,that delam,endure voids/blowholes—fadelong intoafter rarethey stories,leave notthe daily work.