5.5 Solder & Flux Storage
Cold-chain, thaw/mix windows, open time, and FEFO rules for chemistries.
Solder paste and flux
behaveare likeamong livingthe materials:most temperature,time-sensitive time,materials in electronics manufacturing, and handling quietly reshape their chemistrystability longdirectly beforesets the firststage printfor clean prints and reliable joints. Unlike metals or waveboards, hit.these Thechemistries coldkeep chainchanging keeps stability untilfrom the moment ofthey use, thenleave controlled thawingstorage, making the cold chain, thawing, and gentle mixing preventas condensationcritical andas separationany thatmachine sabotage wetting.setting. Open time becomesdefines thetheir workingusable clocklife on the line, whileand FEFO (First Expiry, First Out)issuing ensures the nextright lot issuedruns won’tout dieon schedule rather than mid-run—distinctbuild. With disciplined handling, consumables shift from FIFObeing thatunpredictable simply follows arrival order. Clear “ready/not-ready” cues and simple return rules keep benches honest, and traceability links each containertroublemakers to everysteady, buildrepeatable socontributors trendsto aren’t guesswork. Treating these consumables as time-sensitive assets turns printing and soldering from a roulette of viscosity and activation into a predictable, low-defect process.
5.5.1 Purpose & scope
Keep chemistries—solder paste, liquid flux, adhesives/coatings if used—inside their safe window from dock to print/wave. This covers storage temps, FEFO issuing, thaw/mix, in-use limits, and clear ready/not-ready checks. It ties to 5.1 (IDs), 5.2 (area controls), and 5.6 (kitting/FEFO).
5.5.2 Storage map (cold chain & friends)
Logging: All fridges/cabinets are logged; excursions get a note and a disposition check.
5.5.3 FEFO beats FIFO (issuing rules)
- FEFO = First Expiry, First Out for paste, flux, adhesives/coatings.
- FIFO remains fine for metals (wire/bar) unless the flux core has an expiry.
- Kitting picks the soonest-expiring lot that still has enough life for the planned use + buffer.
- MES shows expiry date and days remaining at pick; don’t override without QE sign-off.
5.5.4 Thaw & mix (make it printable, not sweaty)
Solder paste
- Plan: Move from CHEM-COLD to the CMP-STORE (controlled room) while sealed.
- Thaw sealed: Bring to room temp per jar size (typical 2–6 h; cartridges often 1–2 h). Don’t rush with heat or warm water.
- Dew check: If the jar sweats, you opened too soon. Wipe dry; wait longer. Never open cold paste—condensation ruins it.
- Mix:
- Jar: Gentle hand tumble/figure-8 1–2 minutes after thaw; avoid whipping air.
- Cartridge: Knead to uniform; install piston cleanly.
- Label “IN USE” with Date/Time opened and Operator.
Liquid flux
- Bring to use temp (label). Do not dilute unless procedure specifies; if you must, mix with documented ratios and label MIXED ON / USE BY.
5.5.5 Ready/not-ready checks (before you print/solder)
Paste on printer
- Temperature: Room-temp by IR thermometer or the no-condensation test.
- Viscosity/appearance: Smooth, no separation, no granules.
- Roll height: Within site spec on the stencil (e.g., 8–12 mm).
- Test print: First panel to SPI—volume/height within limits (see 7.x/9.x).
Flux at wave/selective
- Visual: Clear/consistent color; no debris.
- Flow: Spray/puddle pattern stable; no sputter.
- Test coupon: Wetting pattern acceptable.
If any check fails → hold and call QE. Don’t “hope-print.”
5.5.6 In-use limits (open time & return rules)
- Solder paste open time on printer: follow label/site spec (typical 4–8 h). Track with a bench timer or MES tile.
- Refresh policy: Add small increments of fresh paste regularly; don’t pile old on old all day. Retire the roll if SPI drift or graping/smearing appears.
- Jar/cartridge reuse: If re-capping, mark # of opens. Site rule example: max 2 re-opens, then scrap.
- Never return opened paste to the fridge. Keep “IN USE” at room temp for the site-defined use life (e.g., 24–48 h), then scrap.
- Flux pot/tank life: Follow vendor/site interval; log top-ups and filter changes.
- Adhesives/coatings: Respect pot life and UV/moisture sensitivity; discard at USE BY.
5.5.7 Expiry approaching or passed (what to do)
- Approaching: Prioritize by FEFO; schedule builds to consume.
- Just past expiry: Hold the lot. QE may approve re-qualification (small slump/solder balling/wetting checks or vendor CoA extension). If not requalified the same day, scrap.
- Well past expiry or unknown storage: Scrap—don’t trial on customer product.
5.5.8 Clean handling (keep chemistry clean)
- Use dedicated spatulas and lint-free wipes; no metal filings, oil, or hand lotion.
- Keep jar rims/cartridge tips clean; cap immediately after dispensing.
- Don’t leave containers open on benches.
- Segregate lead-free vs SnPb tools and containers; color-code.
5.5.9 Traceability (tie chemistry to the build)
- Each container has a UID (5.1) tied to lot, expiry, thaw/open times, re-opens, and disposition.
- Printers/wave machines log which lot ran each work order.
- If a defect trend appears (e.g., graping), you can pull by lot and review 5.5.5 checks.
5.5.10 Acceptance cues (fast table)
5.5.11 Common traps → smallest reliable fix
5.5.12 Pocket checklists
Before issuing
- FEFO checked; enough life for planned run + buffer
- Fridge/cabinet logs OK; no excursions
Thaw & mix
- Thawed sealed to room; no condensation
- Mixed/kneaded; jar/cartridge IN USE labeled
On the printer / wave
- Open-time timer running
- First article SPI/wet-out OK
- Add fresh paste/flux per plan; retire when drift appears
End of shift
- Scrap or reseal per rule; no fridge return for opened paste
- Tanks capped; lots logged; bench wiped
BottomBy
storing line:treatcold, chemistriesthawing likecarefully, milk with a mission—keep them cold till needed, warm themmixing gently, useand themscrapping withinon thetime, clock,solder paste and issueflux byremain consistent allies instead of hidden risks. Following FEFO. Do that, and print/waveclear startready/not-ready clean,rules defectskeeps stay low,print and youwave neverprocesses discoverstable, “expired”predictable, halfwayand through a build.