5.5 Solder & Flux Storage
Solder paste and flux are unique: they are among the most time-sensitive materials in electronicsthe manufacturing,factory, and their stability directly sets the stage for clean prints and reliable solder joints. Unlike metalsstatic or boards,moisture, their quality constantly degrades over time and temperature. Disciplined handling—from cold chain to thaw protocol—is essential to keep these chemistries keep changing from the moment they leave controlled storage, making the cold chain, thawing, and mixing as critical as any machine setting. Open time defines their usable life on the line, and FEFO issuing ensures the right lot runs out on schedule rather than mid-build. With disciplined handling, consumables shift from being unpredictable troublemakers to steady, repeatablepredictable contributors to yield.
5.5.1 PurposeThe &Cold scopeChain and Storage Standards
KeepThe chemistries—solderchemistry paste, liquid flux, adhesives/coatings if used—inside their safe window from dock to print/wave. This covers storage temps,rules FEFOprioritize issuing,controlling thaw/mix,the in-userate limits,of material change through temperature and clearmanaging ready/not-readyinventory checks.based Iton tiesits toremaining 5.1 (IDs), 5.2 (area controls), and 5.6 (kitting/FEFO).life.
Storage Map: The Control Zones
5.5.2 Storage map (cold chain & friends)
Material | Where it | Temperature |
|
Solder | CHEM-COLD | Per label (typically |
|
Liquid | Cool |
| Keep caps tight; |
Adhesives/ | CHEM-COLD or | Per label | Respect pot life |
Solder | CMP-STORE ( | Room |
|
Logging:Issuing
All fridges/cabinets are logged; excursions get a note and a disposition check.
5.5.3Logic: FEFO beatsBeats FIFO
For all chemistries (issuingpaste, rules)
flux, - adhesives), the issue rule is FEFO = First Expiry, First Out.
forpaste, flux, adhesives/coatings. FIFOPriority:remainsKittingfinemustfor metals (wire/bar) unlesspick thefluxlotcore has an expiry.Kitting pickswith thesoonest-expiringsoonest expiry datelotthat still has enough life for the plannedusebuild+plusbuffer.a buffer.- MES
showsLink: The MES/ERP must display the expiry date and days remainingatduringpick;thedon’tpick process. Never override this withoutQEQuality Engineering (QE) sign-off. Plan:Move Sealed:MoveTransfer the jar or cartridge from CHEM-COLD to the ambient CMP-STORE (controlledorroom)kittingwhilearea) while sealed in its container..- Thaw
sealed:Time:BringAllow the material to reach full roomtemptemperature perjarthesizemanufacturer's specification (typical2–2 – 6hhours;cartridgesforoftenjars).1–2Dohnot rush). Don’t rushwithheatforced heat, warm water, orwarmawater.heat gun. DewCondensationcheck:Check: The container must be opened only after it has reached room temperature. If thejarcontainersweats,sweats when opened, youopenedwaited toosoon.long;Wipe dry; wait longer.Never open cold paste—condensationruinshasit.ruined the paste's performance.Mix:Jar:Mixing:GentlePaste must be gentle; use a hand tumble/figure-81–2motionminutesforafterathaw;jar,avoidor knead a cartridge. Avoid whipping or introducing air.Cartridge:Final Check:KneadBeforetoprinting,uniform;theinstallpastepistonmustcleanly.Label “IN USE”withlookDate/Timesmooth,openeduniform, andOperatorfree of separation or granules.Bringprintedtoboardusemusttemp(label).Do not diluteunless procedure specifies; if you must, mix with documented ratios and labelMIXED ON / USE BY.Temperature:Room-temp by IR thermometer orpass theno-condensationSPI (Solder Paste Inspection)test.check for volume and height. If the print looks wrong,Viscosity/appearance:holdSmooth,thenolineseparation,andnocallgranules.QE.RollOpenheight:Time on Line:WithinSoldersitepastespechas a defined open time limit on the stencil (e.g.,typically8–124mm).Test–print:First panel toSPI—volume/height within limits (see 7.x/9.x).Visual:Clear/consistent color; no debris.Flow:Spray/puddle pattern stable; no sputter.Test coupon:Wetting pattern acceptable.Solder paste open time on printer:follow label/site spec (typical4–8hhours).TrackThis must be tracked with a bench timer orMESthetile.MES.- Refresh
policy:Policy:AddMaintain consistency by adding small increments of fresh pasteregularly;todon’tthepileroll/pot regularly, rather than piling fresh on top of oldon oldpaste all day. Retire therollpasteifwhen its print quality (graping, smearing, SPIdriftdrift)orbecomesgraping/smearingappears.unstable. Jar/cartridgeReturnreuse:Ban:If re-capping, mark# of opens. Site rule example:max 2 re-opens, then scrap.- Never return opened paste to the fridge. Keep
“the "INUSE”USE" paste at room temp fortheits site-defined use life (e.g.,24–24-48h)hours), thenscrap. Fluxscrappot/tankit.life:Mark reusable jars/cartridges with the number of re-opensFollow(e.g.,vendor/sitemaxinterval;2logre-opens permitted).top-upsAdhesives/coatings:Respectpot lifeandUV/moisture sensitivity; discard atUSE BY.
5.5.42 ThawThaw-to-Print & mix (make it printable, not sweaty)Protocol
SolderThe pastethermal transition from cold storage to the printing or soldering process is the most fragile step. Condensation is the primary risk.
Thawing Rules (The No-Condensation Zone)
Mixing and Readiness
LiquidThe flux
5.5.5 Ready/not-ready checks (before you print/solder)
Paste on printer
5.5.3 In-Use Limits and Expiry Management
Once opened, chemistries are actively degrading. Managing time and preventing contamination are the final control steps.
Open Time and Reuse
Flux at wave/selective
If any check fails → hold and call QE. Don’t “hope-print.”
5.5.6 In-use limits (open time & return rules)
Expiry and filter changes.
5.5.7 Expiry approaching or passed (what to do)
Approaching:Near Expiry: Prioritizebythe lot using FEFO;.scheduleSchedule builds toconsume.consume the material before the date.Just past expiry:Expired: If the date passes,HoldHOLD the lot. QE may approve a single re-qualification (e.g., a smallslump/wetting/solderballing/wettingballingcheckstest) or a vendor CoAextension).extension. If notrequalifiedqualified the same day, the material must bescrapscrapped.WellDopast expiry or unknown storage:notScrap—don’ttrialtrialexpired chemistry on customer product.
5.5.84 Clean handling (keep chemistry clean)
Usededicated spatulasHandling andlint-freeCommonwipes;TrapsnoPreventing
metal filings, oil, or hand lotion.Keep jar rims/cartridge tips clean; cap immediately after dispensing.Don’t leave containersopenon benches.Segregatelead-freevsSnPbtoolscontamination andcontainers;dilutioncolor-code.
5.5.9 Traceability (tie chemistry to the build)
Each container has aUID(5.1) tied tolot,expiry,thaw/open times,re-opens, anddisposition.Printers/wave machineslogwhich lotran each work order.If a defect trend appears (e.g., graping), you canpull by lotand review5.5.5checks.
5.5.10 Acceptance cues (fast table)
5.5.11 Common traps → smallest reliable fix
Trap | Symptom | First |
|
| No forced |
Diluting | Weak activation, solder | No dilution unless explicitly defined in procedure; |
| ||
Condensation ruins the paste the next | Keep | |
Mixing | Inconsistent print quality across the run. |
|
Contamination |
|
|
Note
5.5.12Traceability: PocketEach checklists
container's BeforeUID issuing
FEFOtiedchecked;toenough life for planned run + bufferFridge/cabinet logs OK; no excursions
Thaw & mix
Thawedthesealedlot, expiry, thaw/open times, and dispositionto room;no condensationMixed/kneaded; jar/cartridgeIN USElabeled
Onin the printerMES. /This wave
Open-timeyoutimertorunningFirstpullarticleproductSPI/wet-outbuiltOKAddwithfreshapaste/fluxfailingperlotplan;ifretireawhendefectdrifttrend appears later.
End of shift
Scrap or reseal per rule;no fridge returnfor opened pasteTanks capped; lots logged; bench wiped