2.5 Lead Time Management
2.5 Lead Time Management
- The 3 Lead Times:
- Manufacturing LT: How long the supplier takes to make it.
- Transit LT: Time from their dock to our dock.
- Inspection LT: Time from our dock to the shelf (often ignored, causing delays).
- The "Unconfirm" Risk: Protocols for when a supplier de-commits a date. The escalation path to prevent line-down.