3.1 Traceability Standards (IPC-1782)
Traceability is not an archive of what happened; it is the active defense against liability. In the event of a field failure, the granularity of your data determines the scope of your recall. If your traceability is weak, you recall 100% of production. If it is robust, you recall the 0.1% actually affected. Adopt the IPC-1782 standard to define the "Resolution" of your data, transforming traceability from a cost center into an insurance policy.
Defining the Traceability Level (IPC-1782 Tiers)
Do not apply the same data burden to a $5 toy and a $5,000 pacemaker. The IPC-1782 standard defines four distinct levels of granularity. Select the level based on risk, not convenience.
Level 1: Basic (Lot Traceability)
- Scope: Links Work Order to Material Lot Code.
- Granularity: "This batch of 1,000 units might contain capacitors from Reel A."
- Use Case: Consumer Electronics (Mouse, Keyboard), Cables.
- Risk: High Recall Scope (Entire Batch).
Level 2: Standard (Serialized Assembly)
- Scope: Links Serial Number (SN) to Work Order + Test Results.
- Granularity: "Unit SN-123 passed test on Date X." (Components are still Batch-level).
- Use Case: White Goods, Industrial Controllers.
Level 3: Advanced (Component Serialization)
- Scope: Links Serial Number (SN) to Key Component Lots.
- Granularity: "Unit SN-123 contains CPU Lot Y and Memory Lot Z."
- Use Case: Automotive (Safety Critical), Medical Class II.
Level 4: Precision (Full Process Traceability)
- Scope: Links SN to Component Lots + Process Parameters (Torque, Temp, Time).
- Granularity: "Unit SN-123 contains CPU Lot Y, soldered at 245°C for 30s."
- Use Case: Aerospace, Medical Class III (Implantables).
Selection Logic
- If Product Liability Cost > Production Cost → Adopt Level 3 or 4.
- If Regulatory Requirement (FDA/IATF) exists → Follow the mandated Level.
The Chain of Custody (Forward & Backward)
A traceability system must answer two specific questions instantly. If it takes > 1 hour to query, it is broken.
Forward Traceability (Containment)
- Question: "We found a bad Reel of Resistors (Lot 999). Where are they?"
- Action: Input Lot 999 → Output List of Parent Serial Numbers.
- Goal: Quarantine specific units before they ship.
Backward Traceability (Root Cause)
- Question: "Unit SN-123 failed in the field. How was it built?"
- Action: Input SN-123 → Output Bill of Materials (Lots) + Process History.
- Goal: Identify the common factor (e.g., all failures used Lot 999).
Pro-Tip: Test your "Recall Velocity" annually. Give a Lot Number to the Quality Engineer and measure how many minutes it takes to generate the list of affected Serial Numbers. Target: < 15 minutes.
Data Retention & Immutability
Data that expires before the warranty does is useless. Data that can be edited is fraudulent.
Retention Policy
- Standard: Product Lifetime + 2 Years (or 7 Years for Tax/Audit).
- Medical/Aero: Indefinite (or 15+ Years).
Immutability Logic
- If a record is written → It is Read-Only forever.
- If a correction is needed → Append a new record.
- Storage: Use WORM (Write Once, Read Many) storage or Blockchain-verified logs for Level 4 systems.
The "Genealogy" Tree Structure
Traceability data is hierarchical. The MES must build a parent-child relationship tree as the product moves down the line.
Structure
- Root: Finished Good SN.
- Branch 1: PCB SN.
- Leaf: CPU Lot.
- Leaf: Capacitor Reel.
- Branch 2: Housing Lot.
- Branch 3: Firmware Version.
- Branch 1: PCB SN.
Assembly Logic
- If Sub-Assembly (Branch 1) is scrapped → Invalidate the Parent.
- If Sub-Assembly is swapped (Repair) → Update the Tree instantly.
Final Checklist
Category | Metric / Control | Threshold / Rule |
Strategy | Level Selection | Level defined per Product Family (L1-L4) |
Speed | Query Latency | Forward/Backward Trace Report < 15 Mins |
Scope | Components | Critical Components (Class A) tracked to Lot/SN |
Integrity | Edit Access | 0 Users have "Update/Delete" permission on Trace Logs |
Process | Parameter Link | Level 4 links Process Data (Temp/Torque) to SN |
Validation | Mock Recall | Perform 1 Mock Recall per Year |
Archive | Backup | Off-site Immutable Backup verified quarterly |