3.5 Work Instructions & e-Records
Paper work instructions are a liability. They are static, easily defaced, and impossible to revoke instantlyinstantly. whenIf an Engineering Change Order (ECO) is released at 09:00, a criticalpaper-based engineeringfactory changeis occurs.still In a digital-first facility,building the Work"Old InstructionWay" (WI)at is10:00. notThe just a reference document; it is a context-aware control layer that dictates execution and captures the legal recordgoal of production.
Context-Aware DigitalElectronic Work Instructions (DWI)EWI) is not to "digitize the binder," but to synchronize the operator's visual field with the active BOM, Revision, and User Capability.
Station Control & Skill Enforcement
Before showing a single instruction, the system must validate the human at the screen. Access is a privilege, not a default state.
1. The Login Logic
Do not treatuse generic "Line 1" accounts. Every mouse click must trace to a legal identity.
- Mechanism: RFID Badge Scan or Biometric. (Typing passwords is too slow for the
MESfloor). - Timeout:
terminalImplementas"Auto-Logout" on inactivity (e.g., 15 mins) to prevent "Ghost Records" where Operator B works under Operator A's login.
2. The Skill Matrix Gate (Certification Check)
Just because you can log in doesn't mean you can build.
- Logic: If Work_Order requires "Soldering Class 3" AND User_Skill ≠ "Soldering Class 3" → Then Block Station. Display: "Certification Missing."
- Expiry: If Certification_Date < Today → Then Block Station.
- Override: Requires Supervisor Badge scan to authorize a "Trainee Mode" (where the Supervisor accepts liability).
3. Shift Handover
Production is continuous; shifts are not.
- The "Hot Swap": Allow Operator B to scan in while Operator A is still logged in.
- Action: System closes Operator A’s session (End Timestamp) and starts Operator B’s session (Start Timestamp) instantly. No downtime.
The Architecture of EWI
Do not simply display a PDF reader.on Thea operatormonitor. shouldA neverPDF "search"is forpassive. instructions.An TheEWI system must pushbe Context-Aware and Interactive.
Context-Aware Display
The MES knows the exactWork page relevant toOrder, the specificUnit unitID, and station.the Routing Step. The screen must filter the content accordingly.
- Logic: If Unit = Variant A → Then Show Assembly Image A. Hide Image B.
- Logic: If Operator = Trainee → Then Enforce "Step-by-Step" confirmation (Click 'Next' 10 times). If Expert → Allow "Batch" confirmation (Click 'Done' once).
The "RightRead Info,and RightUnderstood" Time" LogicGate
Operators often ignore updates because they look like the old instructions. You must force acknowledgment of change.
- Mechanism: Track the Last_Acknowledged_Rev for every User-Product pair.
- Logic:
- If
UnitCurrent_Revscans>at Station 10User_Last_Ack_Rev →Display WI-10 (Assembly). IfThenUnitLockscans at Station 20 →Display WI-20 (Inspection).IfUnit is a "Variant B" model →Highlight unique steps (e.g., "Add extra gasket") in Red.
Visual StandardFormat:HTML5 / Interactive. Avoid static PDFs where possible.Screen.Media:Action:UseDisplayshort,"ChangeloopedSummary"GIFs(Diff).forRequirecomplexDigitalmotions.SignatureAto5-second video is worth 1,000 words of text.proceed.Ergonomics:Text size must be readable from 1 meter away (Touchscreen distance).
Revision Control & Instant SupersessionThe greatest risk in manufacturing is building today's product with yesterday's specifications. The digital link guarantees that the floor executes thecurrentreleased engineering intent.The Push MechanismWhen Engineering releases Rev B:Immediate Kill:Rev Ais marked "Obsolete" in the database.Active Wipe:Any screen currently displaying Rev A forces a refresh.Active Lock:Result: Thesystem pauses the line and displays aexcuse "NewIRevisiondidn'tAlert."knowTheitoperator must acknowledge the change before resuming.
Pro-Tip: Use "Effectivity Dates" or "Serial Number Cut-ins." If a change applies only after SN 1000, the system must keep showing Rev A for SN 999, even if Rev Bchanged" isreleased.technicallyThis manages WIP transition automatically.impossible. - If
Electronic Records & Sign-Offs (e-Records)
AnThe EWI is the Input; the e-Record is the legalOutput. equivalentEvery ofaction taken by the operator must generate a wet-inkpermanent, signature.immutable Itdatabase transformsrow. aThis "click"is intoyour adefense bindingduring statementan of fact.
Compliance Standardaudit (FDA 21 CFR Part 11 Style)/ GMP).
Data Capture Types
- Implicit Data (Passive):
- Who: User ID.
- When: Timestamp (UTC).
- Duration: Time_End - Time_Start. (Detects if an operator blindly clicked "OK" in 1 second for a 5-minute task).
- Explicit Data (Active):
- Confirmation: "I have inspected the seal." (Checkbox).
- Variable: "Torque Value = 4.5 Nm." (Keypad/Tool Input).
- Evidence: "Photo of the cable routing." (Camera Input).
Validation Logic
- Who: User ID.
- When: Timestamp (UTC).
- Duration: Time_End - Time_Start. (Detects if an operator blindly clicked "OK" in 1 second for a 5-minute task).
- Confirmation: "I have inspected the seal." (Checkbox).
- Variable: "Torque Value = 4.5 Nm." (Keypad/Tool Input).
- Evidence: "Photo of the cable routing." (Camera Input).
Even ifDo not regulatedaccept bydata blindly. Validate at the FDA,point adoptof these principles for robust liability protection.entry.
Attribution:Range Check: If Input < 4.0 or > 5.0 → Then Reject Entry. Display "Out of Spec".- Format Check: If Input is Text but Field expects Float → Then Block Entry.
- Mandatory Fields: If Critical Field is Empty → Then Disable "Complete" button.
The record"ALCOA+" Standard
Adhere to the ALCOA+ framework for data integrity. The MES architecture must linkguarantee undeniablythese five attributes for every record.
- Attributable: Linked to a unique User ID.
Intent:Legible: Stored in human-readable format (or easily rendered).- Contemporaneous: Recorded at the exact moment of execution.
- Original: The first record is the master.
- Accurate: Validated against limits (Min/Max) at the source.
Handling Corrections
Operators make mistakes. The system must displayallow whatcorrection iswithout beingdestroying signed (e.g., "I certify this unit passed Visual Inspection").
Sign-Off Levels
Level 1 (Passive):Scanned badge to log in. Tracks "Who was at the station."Level 2 (Active):Button press "Job Complete." Tracks "Who did the work."Level 3 (Certified):Password re-entry for critical decisions (e.g., Releasing a quarantined lot).
The Audit Trail
history.
The Audit Trail is the "Black Box" of the factory. It answers the "Who, What, When, Why" for every data point.Logic
Immutability Rule
IfScenario:aOperatorrecordentersis"50mm",createdsaves,→realizes it should be "5.0mm".- Action: Operator updates value.
- Database Record:
- Row 1: Value="50", Status="Obsolete", Timestamp=10:00, User=John.
- Row 2: Value="5.0", Status="Active", Timestamp=10:01, User=John, Reason="Entry Error".
- Constraint:
It can never be deleted. IfNever perform an SQL UPDATE or DELETE on arecordproductionisrecord.wrongAlways(e.g., Operator entered 500 instead of 50) →CreateINSERT a new"Correction Record". The original 500 remains visible in history, crossed out but legible.
Traceability Query Logic
You must be able to reconstruct the history of a unit instantly.
Query:"Show me all actions on Unit SN-12345."version.Result:10:00 AM - Created (System)10:05 AM - Assy Start (User: J.Doe)10:15 AM - Torque Recorded: 5.0Nm (Tool: TQ-01)10:20 AM - Inspection Fail (User: Supervisor)10:30 AM - Rework Complete (User: RepairTech)
Final Checklist
Category | Metric / Control | Threshold / Rule |
|
|
|
|
|
|
Versioning |
|
|
|
|
|
Integrity | Immutability | Zero DELETE permissions on Production History tables. |
Inputs | Logic Gates | Block "Next Step" until all Mandatory Fields are populated. |
Audit |
|
|
| Correction |
|
|
|
|