1.24 Environmental Controls
Environmental control is the invisible shield that keeps components reliable. Moisture and static are the silent killers in electronics manufacturing, causing latent failures, costly rework, or critical field returns. By clearly defining storage zones, locking down setpoints, and demanding disciplined material handling, the factory establishes a climate of predictability. When environments remain boring, production lines stay calm and parts survive intact.
1.24.1 Control Zones: Setpoints for Audit & Reliability
Every location where sensitive material resides — from the receiving dock to the final product shelf — is a defined control zone. These setpoints are non-negotiable standards that must be posted, audited, and adhered to.
The Eight Critical Control Zones
Area (MES Code) | Function & Key Rules | Temperature | Humidity |
Inbound Staging (REC-STAGE) | Transit Only. Sealed cartons, maximum 4 hours dwell time. Paste/flux bypass this area, routing immediately to CHEM-COLD. | Ambient | Ambient |
Bulk Parts Warehouse (BULK-PARTS) | Storage for unopened cartons. Time-limited storage (e.g., ≤14 days). Cartons must remain sealed. | Ambient | Ambient (≤70% RH) |
Component Store (CMP-STORE, EPA) | Area for kitting, handling opened/partial packs, and storing all MSDs. ESD floors/shelves are mandatory. | 20 – 26 °C | ≤60% RH (Room) |
Line-Side Supermarket (LINE-SMKT, EPA) | Staging for current/next shift kits. Must be shielded from ovens and drafts. | 20 – 26 °C | ≤60% RH (Room) |
Dry Cabinets (DRY-CAB) | Point storage for MSDs/PCBs. Pauses the moisture clock. Requires local display + independent logging. | Room Temp | ≤10% RH (≤5% preferred) |
Chemistry Cold Chain (CHEM-COLD) | Storage for solder paste, flux, and adhesives per label (typically 0 – 10 ˚C). Separate from components. | Per Label | Not Required |
Quarantine / MRB Staging (NG-QUAR) | Segregated, caged storage for all suspect, expired, or damaged lots. No issue picks allowed. | As CMP-STORE | As CMP-STORE |
Finished Goods Warehouse (FG-WH) | For packed, sealed finished units only. All loose returns/RMAs must route to NG-QUAR. | 15 – 30 °C Preferred | ≤70% RH Preferred |
1.24.2 The Control Chain: Movement and Monitoring Discipline
Maintaining control means managing the transition between zones and demanding strict operational discipline for critical assets like the dry cabinets.
Dry Cabinet Discipline
The dry cabinet is the central component of moisture risk control. Its operation must be managed with extreme prejudice:
- Door Rule: Keep door open time to less than 30 seconds. Do not prop the door.
- Recovery Standard: The internal Relative Humidity (RH) must recover back to the setpoint (≤10% RH) in ≤10 minutes after closing. If recovery fails, the cabinet is immediately tagged OUT OF SERVICE.
- Monitoring: Every cabinet must have a local display and an independent logger that records data hourly or more frequently. Sensors must be verified annually.
- Ownership: Assign a clear owner responsible for monitoring logs and responding to alarms.
Movement Protocol
Material movement must keep the control chain unbroken.
- Transit Speed: Material entering REC-STAGE must move to its final storage (BULK-PARTS or CMP-STORE) quickly—target ≤1 hour. Paste and flux must route to CHEM-COLD ≤15 minutes after arrival.
- Handling: All transfers between CMP-STORE and LINE-SMKT must use shielding totes or bags with the UID visible. Never use unshielded materials (like standard pink poly bags) for transport.
- ESD Surface: All floors, mats, shelves, and carts in controlled areas (EPA) must be dissipative and grounded (bonded). Personnel must use access testers at all EPA entry points.
1.24.3 Alarms, Excursions, and Response
Control is lost when an environmental parameter moves outside its setpoint (excursion). The managerial response must be immediate and documented to maintain audit readiness.
Excursion Response Protocol
Excursion Area | Excursion Trigger | Immediate Action |
DRY-CAB Failure | RH >10% for >60 minutes. | Tag OUT OF SERVICE. Quarantine contents by lot location. Engineering decides bake/reset per 5.4. Fix the cabinet. |
CMP-STORE / LINE-SMKT | Room environment out of range (e.g., RH >60% for >4 hours). | Pause non-critical material issues. Cover WIP. Record the duration and peak level. QE/Engineering assesses exposure and orders controlled bakes for sensitive MSDs. |
CHEM-COLD | Temperature drifts outside the required 0 – 10 ˚C band. | Hold chemistries. Assess material integrity (lot disposition). Do not thaw or issue. |
Common Traps and Reliable Fixes
Trap | Symptom | First Move (The Reliable Fix) |
Ambient Storage | Using BULK-PARTS for long-term storage of MSDs. | Time-limit ambient storage; aggressively route all MSDs to CMP-STORE. |
Door Propping | Overpacked cabinets lead to slow RH recovery. | Ban door propping; reduce load; service seals; owner checks recovery weekly. |
Bad Transport | Using simple pink bags for travel between zones. | Require shielding totes/bags for all material moves. |
Missing Logs | Can't prove control in a quality audit. | Mandate independent loggers and a required daily/weekly review sheet. |
Returns Contamination | Returns/RMAs are dumped in the FG-WH. | Route all RMAs/returns to NG-QUAR only. |
No comments to display
No comments to display