4.1 Indirect Spend Taxonomy + Ownership
Indirect spend—items that do not go into the finished product—is the silent killer of factory profitability. While Direct Material (BOM) is scrutinized to four decimal places, Indirect Spend (MRO, Tools, Services) often bleeds cash through "death by a thousand cuts." Without a rigid taxonomy, Procurement devolves into a personal shopping service for the engineering floor, chasing Amazon links instead of negotiating contracts.
The Spend Taxonomy (The Buckets)
We categorize spend to assign the correct approval logic. Every purchase request (PR) must tag a specific bucket. If it doesn't fit a bucket, it doesn't get bought.
MRO (Maintenance, Repair, Operations)
- Scope: Spare parts for machines (feeders, belts), lubricants, SMT wipes, PPE (gloves, masks).
- Nature: Consumable. Recurring.
- Owner: Maintenance Manager / Production Supervisor.
Tools & Fixtures (Durable)
- Scope: Hand tools (Torque drivers), ESD mats, microscopes, soldering irons, custom test jigs.
- Nature: Durable (Asset Life > 1 year) but Low Value (< $2,500). Requires tracking but not depreciation.
- Owner: Process Engineering Lead.
Calibration & Services
- Scope: Metrology labs, ISO auditors, equipment repair contractors, pest control.
- Nature: Service. intangible outcome.
- Owner: Quality Manager / Facilities Manager.
Packaging (Non-BOM)
- Scope: Bulk shipping cartons, packing tape, bubble wrap, pallets. (Distinct from "Product Packaging" which is Direct).
- Nature: Variable cost linked to shipment volume.
- Owner: Logistics Manager.
IT Hardware & Licensing
- Scope: Laptops, servers, barcode scanners, SaaS subscriptions (Jira, CAD licenses).
- Nature: Asset or Subscription. High security risk.
- Owner: IT Director (Mandatory technical veto).
CAPEX-Lite
- Scope: Small equipment ($2,500 – $10,000). e.g., A new rework station or stencil printer.
- Nature: Capital Asset. Requires ROI justification but follows a faster approval path than Major CapEx.
- Owner: Operations Director.
Ownership & Approval Map
Define the "Delegation of Authority" (DoA) to prevent bottlenecks while maintaining control.
Spend Bucket | Value Threshold | Who Approves? (Budget Holder) | Who Buys? (Execution) | Mandatory Evidence |
MRO / Spares | < $500 | Shift Lead | Buyer / Admin | Part #, Machine ID |
MRO / Spares | > $500 | Maint. Manager | Sr. Buyer | Quote, Last Price Paid |
Tools | Any | Eng. Manager | Buyer | Justification (New Line?) |
IT / Software | Any | IT Director | IT Procurement | Ticket #, Spec Match |
Services | Annual Contract | Plant Manager | Commodity Mgr | SOW (Statement of Work) |
CAPEX-Lite | > $2,500 | VP Ops + Finance | Sr. Buyer | ROI Calculation / Asset Request |
Emergency | Any | Plant Manager | Any Available | "Line Down" Ticket |
The "No-Go" Rules
Enforce these blockers to stop the "Personal Shopper" dynamic.
- The Amazon Ban: Procurement does not use consumer accounts for industrial supplies.
- Why: No tax exemption, no invoice traceability, difficult returns.
- Exception: Urgent "Line Down" spot buy with P-Card (Credit Card).
- The "IT Shadow Spend": Engineering cannot buy software or laptops on expense reports.
- Why: Cybersecurity risk and license non-compliance. IT must procure ALL silicon and software.
- No "Generic" Descriptions: A PR for "Stuff for the lab" is rejected immediately.
- Requirement: MPN, Link, or Quote required.
Mandatory Evidence for Purchasing
Procurement is a transaction engine, not a research department. The Requestor must provide the "Ticket to Ride."
If Request is MRO/Tool:
- Then Provide: Mfr Part Number + Target Supplier + Needed Date.
If Request is Service/Calibration:
- Then Provide: Scope of Work (SOW) + Vendor Contact + Date of Service.
If Request is CAPEX-Lite:
- Then Provide: Asset Tag Request Form + ROI (e.g., "Saves 4 hours labor/week").
Final Checklist
Control Point | Requirement | Critical Threshold |
Taxonomy Tagging | Every PR assigned to a Category | 100% |
IT Lockout | IT Hardware requests routed to IT | Mandatory |
Approval Logic | Thresholds enforced by ERP | Automated |
Quote Policy | 3 Bids required | If Value > $5,000 |
Asset Tagging | CAPEX-Lite items tagged on arrival | > $2,500 Value |
Rejection Rate | PRs returned for "Bad Data" | Tracked Metric |